9 Commissioning
9.4
Commissioning procedure for SH7 Compact Top
Fig.35
Language
34
Solar hydraulic unit
Channel
Meaning
ODB
Drainback option
ORSI
System cooling option
ORA
Accumulator cooling option
OT1
Option thermostat 1
CA1O
Connection temperature thermostat 1
CA1F
Shutdown temperature thermostat 1
TIR
Thermostat 1 cooling
t1O1
Thermostat 1 connection time 1
t1F1
Thermostat 1 shutdown time 1
t2O1
Thermostat 1 connection time 2
t2F1
Thermostat 1 shutdown time 2
t3O1
Thermostat 1 connection time 3
t3F1
Thermostat 1 shutdown time 3
ODT
Thermal disinfection option
REL1
Signal type from R1
MIN
Minimum speed
MAX
Maximum speed
MAN1
Manual mode R1
MAN2
Manual mode R2
IDIO
Language
9.4.1
Settings
Once the filling procedure is complete, the hydraulic unit must be
connected to the power supply.
Although the system is configured in the factory, if the control is reset, the
first time that the control is switched on, the initialisation phase begins
(during which the central key flashes red) and the commissioning menu
launches automatically.
The commissioning menu guides the user through the key adjustment
parameters required to operate the system.
The commissioning menu comprises the parameters described below. To
make an adjustment, set the desired value using the central dial and press
the right-hand key to confirm. The following parameter will appear on the
screen.
Language
Select the language required.
Factory set­
ting
OFF
OFF
OFF
ON
40 ºC
45 ºC
OFF
07:00
08:00
11:00
12:00
18:00
20:00
OFF
SOL
30%
100%
Auto
Auto
ES
7729335 - 04 - 12052021

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sh 7 compact topSh 7Sh 14Sh 7 simple

Table of Contents