Hitachi PSC-AS2048WXB Operation Manual page 9

Air conditioner managing system central station dx management software/ operation ratio
Table of Contents

Advertisement

(4) Reference "operation ratio of EHP by each air conditioner (for each day)" UNITS_yyyymmdd.csv:
This is a csv file contains the result of calculation of operation ratio for each indoor unit regarding 1 cycle or all
cycle as 100%.
(a) Date
YYYY, MM, DD
(b) Address
H-LINK number, REFGN cycle, address
(c) Block (No.)
Block Name, Block No.
(d) Group (No.)
Group Name, Group No.
(e) Load on Indoor
In Mode I::= Thermo on time x capacity
units
In Mode II::= Accumulated expansion valve aperture x
expansion valve coefficient
(f) Load on
In Mode I::= Thermo ON time in the REFGN cycle x total
Outdoor units
capacity
In Mode II::= Accumulated operation current
(g) Indoor /
All indoor units within one particular refrigerant cycle
1 outdoor
(ratio)
(h) Indoor/
1 unit/ All indoor units in all refrigerant cycle (ratio)
All outdoor
(a)
(b) H-LINK No., REFGN cycle,
Address
Date
NOTE:
● If OU using more than 2 REFGN cycles exists, adopt "(h) IU/ALL OU".
(c) Block Name,
(d) Group Name,
Block No.
Group No.
4 digits for year, 2 digits each for
month and day
2 digits (In decimal)
2 digits in decimal for No.
First digit: Alphabet
Last two digits: Decimal
8 digits
8 digits
8 digits
8 digits
7 digits, 100% = 1000000
7 digits, 100% = 1000000
(f)
(e)
Load on
Load on
(g)
outdoor
indoor units
IU/1 OU
units
(h)
IU/All OU
8

Advertisement

Table of Contents
loading

Table of Contents