Air conditioner managing system central station dx management software/ operation ratio
Table of Contents

Advertisement

No.
Condition
3
Charge calc. information is
shown.
4
Upon switching the display
to "Operation ratio display",
pop-up indicating [Retry
adapter exception schedule
information acquisition] is
shown.
5
Upon switching the
display to "Operation ratio
display", pop-up indicating
[Retry adapter connection
information acquisition] is
shown.
6
Upon switching the display
to "Operation ration
display", pop-up indicating
[Retry adapter group/block
information acquisition] is
shown.
Items to be Checked
Is 1GB of free space assured in
the management computer?
Isn't the management computer
set to standby state or hibernation
state?
Did you change Schedule
Settings?
Did you change Unit group or
conduct connection confirmation?
Did you change group/block
information?
Action
Clear the memory to assure more than
1GB of free space or substitute the
computer with another with larger space.
Management computer may not operate
properly in standby or hibernation
condition. Go to [Start] - [Control Panel] -
[Power Options].
• Go to [Power Options Properties] and
set "Never" in System standby tab and
System hibernates tab.
If using laptop, set "Do nothing" in When
I press the sleep button on my computer
tab.
This pop-up is shown upon the entry to
Operation ratio display after changing
schedule settings.
This pop-up is shown upon the entry
to Operation ratio display after either
changing unit group or checking
connection.
This pop-up is shown upon the entry to
Operation ratio display after changing
group/block information settings.