Hydraulic Connections; Hydraulic Circuit Diagram - Riello RL 28/M Installation, Use And Maintenance Instructions

Light oil burners, progressive two-stage or modulating operation
Table of Contents

Advertisement

6.2

Hydraulic connections

 Make sure that the hoses to the pump supply
and return line are installed correctly.
CAUTION
The pumps are equipped with a by-pass that connects return line
with suction line. They are installed on the burner with the by-
pass closed by screw 6)(Fig. 21).
It is therefore necessary to connect both hoses to the pump.
The pump will break down immediately if it is run with the return
line closed and the by-pass screw inserted.
Remove plugs from suction and return connectors of the pump.
Insert the flexible hoses with the supplied seals into the
connections and screw them down.
During the installation, hoses must not be
stressed with twisting.
ATTENTION
 Pass the flexible hoses through the holes of the plate,
preferably on the right, (Fig. 20);
 undo the screws 1), divide the insert piece into parts 2) and 3);
 remove the thin diaphragm blocking the two holes 4).
 Install the hoses where they cannot be stepped on or come
into contact with hot surfaces of the boiler.
 Finally, connect the other end of the flexible hoses to the
nipples supplied, using two wrenches: one on the hose's
swivel fitting, for screwing, and one on the nipple, to
counteract the reaction force.
Key (Fig. 21)
1
Pump suction line
2
Filter
3
Pump
4
Pressure adjuster
5
Return pipe
6
Bypass screw
7
Pump return line
8-15-16
Solenoid valves
9
Delivery line
10
Nozzle
11
Return line
12
Pressure adjustment
13
Pressure adjustment eccentric
14
Maximum oil pressure switch
M
Pressure gauge
V
Vacuometer connection
20166434
Hydraulic system
4
1
2 3
6.2.1

Hydraulic circuit diagram

20
GB
20170884
Fig. 20
D873
Fig. 21

Advertisement

Table of Contents
loading

Table of Contents