Completing The Test; Directional Over-Power Protection Goppdop; Verifying The Settings - ABB Relion 650 Series Commissioning Manual

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 504 109-UEN -
5.4.8.2
5.4.9
5.4.9.1
RET650
Commissioning Manual
angle for step 1 (equal to 0° for low forward power protection and equal to
180° for reverse power protection). Check that the monitored active power is
equal to 100% of rated power and that the reactive power is equal to 0% of
rated power.
3.
Change the angle between the injected current and voltage to Angle1 + 90°.
Check that the monitored active power is equal to 0% of rated power and that
the reactive power is equal to 100% of rated power.
4.
Change the angle between the injected current and voltage back to 0°.
Decrease the current slowly until the START1 signal, start of stage 1, is
activated.
5.
Increase the current to 100 % of IBase.
6.
Switch the current off and measure the time for activation of TRIP1, trip of
stage 1.
7.
If a second stage is used: repeat points 2 - 6 for the second stage.

Completing the test

Continue to test another function or end the testing by setting the parameter
TestMode to Off under Main menu/Tests/IED test mode/1:TESTMODE. If
another function is tested, then set the parameter Blocked to No, under Main menu/
Tests/Function test modes/<Function group>/<Function>/<1:Function> for the
function, or for each individual function in a chain, to be tested next. Remember to
set the parameter Blocked to Yes, for each individual function that has been tested.

Directional over-power protection GOPPDOP

Prepare the IED for verification of settings as outlined in
verify
settings".
Values of the logical signals are available on the local HMI under: Main menu/
Tests/Function status/<Function group>/<Function>/<1:Function>. The Signal
monitoring tool in PCM600 shows the same signals that are available on the LHMI.

Verifying the settings

The overpower protection shall be set to values according to the real set values to
be used. The test is made by means of injection of voltage and current where the
amplitude of both current and voltage and the phase angle between the voltage and
current can be controlled. During the test the analog outputs of active and reactive
power shall be monitored.
Procedure
1.
Connect the test set for injection of voltage and current corresponding to the
mode to be used in the application. If a three phase test set is available this
could be used for all the modes. If a single phase current/voltage test set is
available the test set should be connected to a selected input for one phase
current and voltage.
Section 5
Testing functionality
4.1 "Preparing the IED to
49