Installation / Controls - Vauconsant EXIGENCE User Manual

Advertisement

Installation:
o
Before connecting to the mains, you must check that the existing voltage is suitable for the
one mentioned on the unit's identity plaque.
Connect to the mains on the cabling fuse holder or connect the plug to the mains in the
case of a mobile unit.
The line should be protected by a differential circuit breaker on the general electricity panel.
Installation of a breath shield (heating display option)
o
1. Dismantle the upper glass brackets with a six-sided spanner Ø 2.5
2. Stick the black non-slip adhesive patches in the specified markings on the part of the bracket in
contact with the breath shield.
3. Install the glass, the non-domed end should be positioned 120 km from the edge of the beam.
4. Tighten the upper brackets.
Upper glass brackets
Connection to plumbing
The water inlet should be cold, on standby with a 15x21 stopcock.
Drainage with at least 40 mm interior diameter, levelled on the floor and siphoned.
Connect the water supply with copper tube on the 15x21 male connector fixed at the output of the solenoid
valve.
Normal pressure of use: 4 bars. For higher pressure, use a pressure control valve to avoid dysfunction or
deterioration of the solenoid valve
Connect the drainage hose to the floor.
Vauconsant SA, all rights reserved A623xx -rev0-ENG, 14/10/2010

Installation / Controls

USER MANUAL
- 4 -