Scope Of Delivery 3; Installation 4; Planning; Hydraulic Integration - Vaillant 00 2003 6743 Installation Instructions Manual

External 3-way valve
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 20
3
Scope of delivery
A
B
AB
4
3 x
7
Fig. 3.1 Scope of delivery for external 3-way valve
Item Quantity
Component
1
1
3-way valve motor
2
1
3-way valve body
3
1
Connection cable with Molex connector
Connector pipes, 28 mm with support
4
3
sleeves
5
3
Cap nuts 5/4"
6
3
Seals
7
1
Installation instructions
Table 3.1 Scope of delivery
Installation instructions for external 3-way valve 0020037633_03
3
1
2
5
6
3 x
3 x
4
Installation
4.1

Planning

>
Plan the hydraulic installation for the multi-functional
storage cylinder.
>
When planning, note that operation with a heat pump
requires separate hydraulic circuitry for the hot
water standby zone (hot water heated to consump-
tion setpoint) and the central heating buffer volume,
in order to use the multi-functional storage cylinder
in a properly effective way.
>
Refer also to the information in the system
manual for the multi-functional storage cylinder
(¬ Installation and maintenance instructions for
allSTOR buffer cylinder system), especially the
illustrations showing the hydraulic layouts.
4.2

Hydraulic integration

B <-> AB
A
AB <-> A
A
Fig. 4.1 Installation as a distributor in the heating flow line
from the heater
The 3-way valve, Kvs = 7.7, is integrated hydraulically as
follows:

Scope of delivery 3

Installation 4

B
AB
B
AB
GB
5

Advertisement

Table of Contents
loading

Table of Contents