4 Before operation
4.1 Overview: Before operation
4.2 To insert the batteries
4.3 To mount the user interface holder
FTXTP25+35M5V1B
Daikin room air conditioners
4D520466-11E – 2021.03
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
▪
Inserting the batteries in the user interface.
▪
Fixing the user interface to the wall.
▪
Turning on the power supply.
The batteries will last for about 1 year.
1 Remove the back cover.
2 Insert both batteries at once.
3 Put the cover back.
1
2
AAA.LR03
a
b
c
a User interface
b Screws (field supply)
c User interface holder
1 Choose a place where the signals reach the unit.
2 Attach the holder with screws to the wall or a similar location.
3 Hang the user interface on the user interface holder.
3
2×
4
Before operation
|
User reference guide
15