Summary of Contents for Vanguard Instruments Company TRF-100

  • Page 1 TRF-100 THREE-PHASE TRANSFORMER TURNS-RATIO METER USER’S MANUAL Vanguard Instruments Company, Inc. 1520 S. Hellman Ave. Ontario, California 91761, USA TEL: (909) 923-9390 April, 2016 FAX: (909) 923-9391 Revision 1.0...
  • Page 2 Operating Voltage: The TRF-100 is rated for use with an operating voltage of 120V or 240V, auto-ranging ±10% of selected voltage. Power Cord: The TRF-100 is supplied with a 16 AWG, 16A power cord with a NEMA 5-15P plug. Replacement cable shall have the same or better rating and is available through the manufacturer.
  • Page 3: Table Of Contents

    Restoring a Test Record From Flash EEPROM ............56 3.8.2. Reviewing a Test Record ..................60 3.8.3. Printing the Test Record Directory (TRF-100 with built-in printer option only) ..62 3.8.4. Erasing Test Records from the Flash EEPROM ............64 Working With Test Plans ....................67 3.9.1.
  • Page 4 LIST OF TABLES Table 1. TRF-100 Technical Specifications ..................4 Table 2. Functional Descriptions of TRF-100 Controls and Indicators ..........6 Table 3. Descriptions of Single Phase Test Results Elements (Column Format) ......33 Table 4. Descriptions of Single Phase Test Results Elements (Detailed Format) ......34 Table 5.
  • Page 5: Conventions Used In This Document

    HIS DOCU UMENT This docu ument uses the followin ng conventio ons: A key y, switch, or knob on the e TRF-100 is indicated as [KEY], [S SWITCH], [ [KNOB] • Menu u names are e referenced as “MENU N NAME”...
  • Page 6: Introduction

    In addition to measuring a transformer’s turns-ratio, the TRF-100 can also measure a transformer’s excitation current (in milli-amperes) and its winding phase angle. Three test voltages (4 Vac, 40 Vac, 100 Vac) allow the TRF-100 to test CT’s and PT’s, as well as power transformers.
  • Page 7 Test records can be recalled locally or transferred to a PC via the USB interface. Transformer Test Plans The TRF-100 can store up to 128 transformer test-plans in its Flash EEPROM. A test plan is comprised of the transformer nameplate voltages for each tap setting. The calculated turns- ratio based on the nameplate voltages is compared with the measured turns-ratio to derive the percentage error and Pass/Fail results.
  • Page 8: Technical Specifications

    REV 1.0 TRF-100 U USER’S MAN TRF-100 Te echnical Sp pecification Table e 1. TRF-100 Technical S Specifications TYPE P Portable, lightw weight, automat tic, three-phase e transformer t urns-ratio mete FICATIONS D Dimensions: 1 7”W x 7”H x 13 3”...
  • Page 9: Controls And Indicators

    TRF-100 USER’S MANUAL REV 1.0 Controls and Indicators The TRF-100 controls and indicators are shown in Figure 1. A leader line with an index number points to each control and indicator, which is cross-referenced to a functional description in the corresponding table.
  • Page 10: Table 2. Functional Descriptions Of Trf-100 Controls And Indicators

    REV 1.0 TRF-100 USER’S MANUAL Table 2. Functional Descriptions of TRF-100 Controls and Indicators Item Panel Markings Functional Description Number EMERGENCY Emergency turn off test voltage switch TURN OFF "PUSH" H voltage connector Optional built-in thermal printer X voltage connector...
  • Page 11: Pre-Test Setup

    [] Printer Paper (if printer installed) The TRF-100’s optional built-in thermal printers use 4.5-inch wide thermal paper for printing test results. To maintain the highest print quality and to avoid paper jams, the use of thermal paper supplied by Vanguard Instruments Company is highly recommended. Additional paper can be ordered from the following sources: Vanguard Instruments Co, Inc.
  • Page 12: Operating Procedures

    X cables. The transformer bushings should also be grounded before connecting test leads to the transformer. This will prevent inducing any voltages into the TRF-100. All transformer bus connections must be removed, and the transformer must be isolated before performing any tests.
  • Page 13: Typical Connections To A Single Phase Transformer

    TRF-100 USER’S MANUAL REV 1.0 3.1.2. Typical Connections to a Single Phase Transformer Figure 3. Typical Connections to a Single Phase Transformer Figure 4. Typical Connections to a Single Phase Auto Transformer...
  • Page 14: Typical Connections To A Voltage Regulator

    REV 1.0 TRF-100 USER’S MANUAL 3.1.3. Typical Connections to a Voltage Regulator Figure 5. Typical Connections to a Type A Voltage Regulator Figure 6. Typical Connections to a Type B Voltage Regulator...
  • Page 15: Typical Connections To A Donut Type (Un-Mounted) Current Transformer

    TRF-100 0 USER’S MA ANUAL RE V 1.0 3.1.4. T Typical Con nnections to a Donut t Type (un- -mounted) Current T ransforme gure 7. Typica al Connectio ons to a Don ut Type (un- mounted) Cu urrent Transf former (CT)
  • Page 16: Typical Connections To A Multi-Tap Current Transformer

    REV 1.0 TRF-100 USER’S MANUAL 3.1.5. Typical Connections to a Multi-Tap Current Transformer Figure 8. Typical Connections to a Multi-Tap Current Transformer...
  • Page 17: Typical Connections To A Bushing Mount Ct On A Single Phase Transformer

    TRF-100 USER’S MANUAL REV 1.0 3.1.6. Typical Connections to a Bushing Mount CT on a Single Phase Transformer Figure 9. Typical Connections to a Bushing Mount CT on a Single Phase Transformer...
  • Page 18: Typical Connections To Bushing Mount Ct's On Delta Transformer

    REV 1.0 TRF-100 U USER’S MAN 3.1.7. T Typical Con nnections to Bushing g Mount CT T’s on Delt ta Transfo ormer Figure 10. Typical Con nnections to Bushing Mo ount CT's on Delta Transf former The C CT turns-rati...
  • Page 19: Typical Connections To Bushing Mount Ct's On Wye Transformer

    TRF-100 0 USER’S MA ANUAL RE V 1.0 3.1.8. T Typical Co onnections s to Bushin ng Mount C CT’s on Wy ye Transfo rmer Figure 11. . Typical Con nnections to Bushing Mo ount CT's on Wye Transf former...
  • Page 20: Setting The Test Voltage

    REV 1.0 TRF-100 U USER’S MAN Setting the Test Volta The TRF- 100 offers th hree test vo ltages, 4 Vac c, 40 Vac, an nd 100 Vac. T The unit alw ways defaults s to 40 Vac at t power-on.
  • Page 21 TRF-100 USER’S MANUAL REV 1.0 d. The following screen will be displayed: SELECT TEST VOLTAGE 1. 4V 2. 40V 3. 100V Select the desired test voltage by pressing the corresponding key on the numeric keypad , or e. The voltage will be set and the following confirmation message will be displayed: 40 VOLTS SET! Press any key to return to the “START-UP”...
  • Page 22: Toggling The Calibration Notification Feature

    Toggling the Calibration Notification Feature (TRF-100 with built-in printer option only) The TRF-100 offers a convenient feature that can print the unit's calibration due date at the bottom of the test reports printed on the unit's thermal printer: a. Start from the "START-UP" menu: 1.TEST XFMR...
  • Page 23: Figure 12. Test Record Printout Showing Calibration Due Date

    TRF-100 USER’S MANUAL REV 1.0 e. The following screen will be displayed: CAL DATE PRINTING: 1.ENABLE 2.DISABLE Press the key (ENABLE) to enable or the key (DISABLE) to disable this feature. f. The following screen will be displayed: CAL DATE PRINTING ENABLED.
  • Page 24: Setting The User Interface Language

    REV 1.0 TRF-100 USER’S MANUAL Setting the User Interface Language The TRF-100's user interface language can be changed by following the steps below (English, Spanish, and Turkish are supported): g. Start from the "START-UP" menu: 1.TEST XFMR 04/28/16 2.SETUP 10:15:20 3.CALCULATOR...
  • Page 25 TRF-100 USER’S MANUAL REV 1.0 Select your preferred language by pressing the corresponding key on the keypad. l. The following screen will be displayed: ENGLISH SET Press any key to return to the "START-UP" menu. All menu items and prompts will now...
  • Page 26: Setting The Date And Time

    REV 1.0 TRF-100 USER’S MANUAL Setting the Date and Time To set the date and time: a. Start from the “START-UP” menu: 1.TEST XFMR 04/28/16 2.SETUP 10:15:20 3.CALCULATOR 4.DIAG 5.QUICK TST Press the key (SETUP). b. The following screen will be displayed: 1.ENTER XFMR ID...
  • Page 27: Using The Turns Ratio Calculator

    TRF-100 USER’S MANUAL REV 1.0 Using the Turns Ratio Calculator The TRF-100 features a turns ratio calculator that can be used to calculate the turns ratio for various transformer types. The user only needs to provide the H and X name plate voltage values.
  • Page 28 REV 1.0 TRF-100 USER’S MANUAL e. The following screen will be displayed showing the H and X name plate voltages along with the calculated turns ratio: Y to DELTA XFORMER H:1,734 V X:100 V RATIO: 10.011 Press any key to return to the “START-UP” menu.
  • Page 29: Performing Tests

    TRF-100 USER’S MANUAL REV 1.0 Performing Tests 3.7.1. Entering Test Record Header Information You can enter the test record header information before performing tests. The record header includes identifying information such as the company, station, circuit, manufacturer, etc. Once the header information has been set, it will apply to all subsequent test records. To enter the header information: a.
  • Page 30 REV 1.0 TRF-100 USER’S MANUAL d. The following screen will be displayed: STATION: ( TO POSITION) Type the station name using the keypad and then press the key. [ENTER] e. The following screen will be displayed: CIRCUIT: ( TO POSITION) Type the circuit information using the keypad and then press the key.
  • Page 31 TRF-100 USER’S MANUAL REV 1.0 i. The following screen will be displayed: KVA: ( TO POSITION) Type the transformer’s KVA rating using the keypad and then press the [ ] key. ENTER j. The following screen will be displayed: OPERATOR: (...
  • Page 32: Testing A Single Phase Transformer

    REV 1.0 TRF-100 U USER’S MAN 3.7.2. T Testing a S ingle Phas se Transfo rmer Follow th he steps belo ow to test a single phase e transforme a. St tart from th e “START-UP P” menu: 1.TEST XFMR 0 04/28/16 2.SETUP...
  • Page 33 TRF-100 USER’S MANUAL REV 1.0 ENTER H WINDING NAME-PLATE VOLTAGE: Type the H winding name plate voltage value using the numeric keypad. The screen will be updated as shown below: ENTER H WINDING NAME-PLATE VOLTAGE: 2000 V Press the key.
  • Page 34 REV 1.0 TRF-100 U USER’S MAN d. T he following g screen will be displaye SINGLE PHASE XFORMER "START T" TO R RUN TEST "STO OP" TO ABORT ress the key t to initiate th he test. TART] e. T...
  • Page 35 TRF-100 0 USER’S MA ANUAL RE V 1.0 g. T he following g screen will be displaye PRINT F FORMAT? 1.COLUM 2.DETAI ress the key (COLUM MN) to print a columnar report (see Figure 13) o or press the ey (DETAILE...
  • Page 36 REV 1.0 TRF-100 U USER’S MAN EST SAVE ess any key t to continue t to step j. j. T he following g screen will be displaye RUN ANO OTHER T TEST? 1.YES 2.NO 3.REPEA AT PREV. . TEST ress the key (NO).
  • Page 37: Table 3. Descriptions Of Single Phase Test Results Elements (Column Format)

    TRF-100 USER’S MANUAL REV 1.0 Figure 13. Single Phase Test Results Printout - Column Format (TRF-100 with optional built-in printer only) Table 3. Descriptions of Single Phase Test Results Elements (Column Format) Item Description Number Test record date and time.
  • Page 38: Table 4. Descriptions Of Single Phase Test Results Elements (Detailed Format)

    REV 1.0 TRF-100 USER’S MANUAL Figure 14. Single Phase Test Results Printout - Detailed Format (TRF-100 with optional built-in printer only) Table 4. Descriptions of Single Phase Test Results Elements (Detailed Format) Item Description Number Test record date and time.
  • Page 39: Performing A Three-Phase Test (Dt-Y Example)

    TRF-100 0 USER’S MA ANUAL RE V 1.0 3.7.3. P Performing a Three-P Phase Test (dT-Y Exa ample) Follow th he steps belo ow to perfor rm a three-p phase test. T The following g example is s for testing a...
  • Page 40 REV 1.0 TRF-100 USER’S MANUAL Press the key if you would like to use the name plate voltage values from the previous test performed, and then continue to step d. See below for details about options 1 and 2. 1. YES...
  • Page 41 Finally, the screen will be updated with the Phase C test results as shown: RATIO % DIFF +99.994 0000 0.07 +100.02 0000 0.09 +100.02 0000 0.09 Press any key to continue. If your TRF-100 has the built-in printer option, continue to step g.
  • Page 42 REV 1.0 TRF-100 USER’S MANUAL If your TRF-100 does NOT have the built-in printer option, continue to step i. g. The following screen will be displayed: PRINT TEST RESULTS? 1.YES 2.NO Press the key (YES) to print the test results.
  • Page 43: Figure 15. Delta To Y Test Results Printout - Column Format

    SAVING RECORD... PLEASE WAIT... The following confirmation screen will then be displayed: RECORD 002 SAVED! Press any key to return to the “START-UP” menu. Figure 15. Delta to Y Test Results Printout - Column Format (TRF-100 with built-in printer option only)
  • Page 44: Table 5. Descriptions Of Y To Delta Test Results Elements (Column Format)

    REV 1.0 TRF-100 USER’S MANUAL Table 5. Descriptions of Delta to Y Test Results Elements (Column Format) Item Description Number Test record date and time. Test record header information (see section 3.7.1). Test voltage. Type of transformer under test. H tap voltage.
  • Page 45: Figure 16. Delta To Y Test Results Printout - Detailed Format

    TRF-100 USER’S MANUAL REV 1.0 Figure 16. Delta to Y Test Results Printout - Detailed Format (TRF-100 with built-in printer option only)
  • Page 46: Table 6. Descriptions Of Y To Delta Test Results Elements (Detailed Format)

    REV 1.0 TRF-100 USER’S MANUAL Table 6. Descriptions of Delta to Y Test Results Elements (Detailed Format) Item Description Number Test record date and time. Test record header information (see section 3.7.1). Test voltage. Type of transformer under test. Test H1-H3 and X1-X0 section heading.
  • Page 47: Performing A Special Transformer Test

    TRF-100 USER’S MANUAL REV 1.0 3.7.4. Performing a Special Transformer Test The TRF-100 can test 67 transformer types defined by ANSI, CEI/IEC and Australian standards. Follow the steps below to perform a test on one of these transformer types (See Appendix B, C, and D for a list of supported transformer types and their corresponding special test numbers): a.
  • Page 48 REV 1.0 TRF-100 U USER’S MAN 2. SCROL LL TO SELEC Press (SCROLL TO SELECT) to s scroll throug gh the list of f supported transf former types s. The follow wing screen w will be displa ayed: PECIAL T...
  • Page 49 TRF-100 0 USER’S MA ANUAL RE V 1.0 ENTER H WINDI NAME-PLAT TE VOLT TAGE: 1734 V Press key. [ENTE The fo ollowing scre een will be d displayed: ENTER X WINDI NAME-PLAT TE VOLT TAGE: Type t the X windin...
  • Page 50 RATIO % DIFF +100.04 0002 +100.06 0002 +100.05 0002 Press any key to continue. If your TRF-100 has the built-in printer option, continue to step i. If your TRF-100 does NOT have the built-in printer option, continue to step k.
  • Page 51 TRF-100 USER’S MANUAL REV 1.0 i. The following screen will be displayed: PRINT TEST RESULTS? 1.YES 2.NO Press the key (YES) to print the test results. j. The following screen will be displayed: PRINT FORMAT? 1.COLUMN 2.DETAILED Press the key (COLUMN) to print a columnar report (see Figure 17) or press the key (DETAILED) to print a detailed report.
  • Page 52: Figure 17. Special Dy11 Transformer Test Printout

    The following screen will be displayed momentarily: SAVING RECORD... PLEASE WAIT... The following confirmation screen will then be displayed: RECORD 003 SAVED! Press any key to return to the “START-UP” menu. Figure 17. Special Dy11 Transformer Test Printout (TRF-100 with built-in printer option only)
  • Page 53: Performing A Quick Test

    TRF-100 0 USER’S MA ANUAL RE V 1.0 3.7.5. P Performing a Quick T Test The quick k test mode can be used d to initiate a a transforme er ratio test by pressing only two ke eys. Follow th...
  • Page 54 REV 1.0 TRF-100 USER’S MANUAL c. The following screen will be displayed: XFMR NAME PLATE VLTG 1.YES 2.NO 1. YES Press the key (YES) if you would like to enter the transformer name plate voltage values. The following screen will be displayed:...
  • Page 55 DELTA to Y XFORMER H:12,000 X:208 1.START TEST 2.CHANGE XFMR Press the key (START TEST). e. The TRF-100 will perform the selected test and display the test results on the LCD screen as shown below: RATIO % DIFF +99.994 0000 0.07 +100.02 0000 0.09...
  • Page 56: Testing A Three Phase Transformer Using Auto Detect Mode

    REV 1.0 TRF-100 USER’S MANUAL 3.7.6. Testing a Three Phase Transformer Using Auto Detect Mode The TRF-100 provides a convenient Auto Detect mode that can automatically detect 130 specific vector groups for different transformer types defined by ANSI, CEI/IEC, and Australian standards.
  • Page 57 Press any key to continue. If your TRF-100 has the built-in printer option, continue to step g. If your TRF-100 does NOT have the built-in printer option, continue to step i. g. The following screen will be displayed: PRINT TEST RESULTS? 1.YES...
  • Page 58 REV 1.0 TRF-100 USER’S MANUAL h. The following screen will be displayed: PRINT FORMAT? 1.COLUMN 2.DETAILED Press the key (COLUMN) to print a columnar report or press the key (DETAILED) to print a detailed report. i. The following screen will be displayed: KEEP THIS READING? 1.YES...
  • Page 59 TRF-100 USER’S MANUAL REV 1.0 SAVING RECORD... PLEASE WAIT... The following confirmation screen will then be displayed: RECORD 005 SAVED! Press any key to return to the “START-UP” menu.
  • Page 60: Restoring A Test Record From Flash Eeprom

    REV 1.0 TRF-100 USER’S MANUAL Working With Test Records 3.8.1. Restoring a Test Record From Flash EEPROM Use the steps below to restore a test record from the TRF-100’s Flash EEPROM to the working memory: a. Start from the “START-UP” menu: 1.TEST XFMR...
  • Page 61 The following screen will be displayed: RECORD RESTORED! Press any key to continue. If your TRF-100 has the built-in printer option, continue to step 1.3. If your TRF-100 does NOT have the built-in printer option, continue to step 1.4. 1.3.
  • Page 62 REV 1.0 TRF-100 USER’S MANUAL 1.4. The following screen will be displayed: REVIEW RECORD Press the key. The test record details will be displayed as shown: [] DELTA to Y XFORMER 1 TAP 04/29/16 10:12:28 TEST VTG = 40 Press the key again to view the test data: []...
  • Page 63 TRF-100 USER’S MANUAL REV 1.0 When you have located the test record that you would like to restored, press the key. Continue to step 1.2 on page 57. [ENTER]...
  • Page 64: Reviewing A Test Record

    3.8.2. Reviewing a Test Record You can print (TRF-100 with built-in printer option only) or display a test record at the time that it is restored, or you can restore it to the working memory and review it later. To print or display the current test record in the working memory: a.
  • Page 65 TRF-100 USER’S MANUAL REV 1.0 Press the key (COLUMN) to print the test record in columnar format, or press the key (DETAILED) to print the test record in detailed format. The test record will be printed, and you will be returned to the “START-UP” menu.
  • Page 66: Printing The Test Record Directory (Trf-100 With Built-In Printer Option Only)

    REV 1.0 TRF-100 USER’S MANUAL 3.8.3. Printing the Test Record Directory (TRF-100 with built-in printer option only) Follow the steps below to print a directory of the test records stored in the unit’s Flash EEPROM: a. Start from the “START-UP” menu: 1.TEST XFMR...
  • Page 67: Figure 18. Typical Test Record Directory Printout

    TRF-100 USER’S MANUAL REV 1.0 Figure 18. Typical Test Record Directory Printout...
  • Page 68: Erasing Test Records From The Flash Eeprom

    REV 1.0 TRF-100 USER’S MANUAL 3.8.4. Erasing Test Records from the Flash EEPROM Follow the steps below to erase test records from the Flash EEPROM: a. Start from the “START-UP” menu: 1.TEST XFMR 05/05/16 2.SETUP 10:15:20 3.CALCULATOR 4.DIAG 5.QUICK TST Press the key (SETUP).
  • Page 69 TRF-100 0 USER’S MA ANUAL RE V 1.0 You can canc cel the proce ess and retu urn to the “ST TART-UP” m menu by pres ssing key. [STOP] NOTE Type the record num ber that you u would like...
  • Page 70 REV 1.0 TRF-100 USER’S MANUAL The following screen will be displayed when all test records have been completely erased: RECORDS ERASED! Press any key to return to the “START-UP” menu.
  • Page 71: Working With Test Plans

    PC (see the TTRA S2 software manual for details). Test plans can then be transferred to the TRF-100 and used to quickly perform tests. 3.9.1. Performing a Test Using a Transformer Test Plan Follow the steps below to perform a test using a test plan: a.
  • Page 72 REV 1.0 TRF-100 USER’S MANUAL e. The following screen will be displayed: LOAD TEST PLAN 1.ENTER PLAN NUMBER 2.SCROLL TO SELECT 1. ENTER PLAN NUMBER Press the key (ENTER PLAN NUMBER) if you know the test plan number that you would like to use. The following screen will be displayed:...
  • Page 73 TRF-100 0 USER’S MA ANUAL RE V 1.0 f. St tart from th e “START-UP P” menu aga ain to run a t test using th he loaded tes st plan from m the revious step 1.TEST XFMR 5/05/16 2.SETUP 10:15:2 3.CALCU...
  • Page 74 REV 1.0 TRF-100 U USER’S MAN RATIO % DIF +99.991 0001 0.07 +99.986 6 0001 0.06 +99.996 6 0002 0.09 r each phase e (A, B, and C C) a “P” or “F F” will be dis splayed next t to the...
  • Page 75 TRF-100 USER’S MANUAL REV 1.0 TEST SAVED Press any key to continue. o. If the test plan included multiple tests, the start-up screen for the next test will be displayed as shown: TAP NUMBER 2 H VTG:12000 X VTG: 208 "START"...
  • Page 76: Figure 19. Test Plan Test Results Printout

    REV 1.0 TRF-100 USER’S MANUAL RECORD 007 SAVED! Press any key to return to the “START-UP” menu. Figure 19. Test Results Printout...
  • Page 77: Unloading A Test Plan From The Working Memory

    TRF-100 USER’S MANUAL REV 1.0 3.9.2. Unloading a Test Plan From the Working Memory Follow the steps below to unload a test plan from the working memory: a. Start from the “START-UP” menu: 1.TEST XFMR 05/06/16 2.SETUP 10:15:20 3.CALCULATOR 4.DIAG 5.QUICK TST...
  • Page 78 REV 1.0 TRF-100 USER’S MANUAL e. The test plan will be unloaded from the working memory, and the following screen will be displayed: TEST PLAN CLEARED! Press any key to return to the “START-UP” menu.
  • Page 79: Printing The Test Plan Directory (Trf-100 With Built-In Printer Option Only)

    TRF-100 USER’S MANUAL REV 1.0 3.9.3. Printing the Test Plan Directory (TRF-100 with built-in printer option only) Follow the steps below to print a directory of the test plans stored in the unit’s Flash EEPROM (TRF-100 with built-in printer option only): a.
  • Page 80: Figure 20. Sample Test Plan Directory Printout

    REV 1.0 TRF-100 USER’S MANUAL Figure 20. Sample Test Plan Directory Printout...
  • Page 81: Printing A Test Plan (Trf-100 With Built-In Printer Option Only)

    TRF-100 USER’S MANUAL REV 1.0 3.9.4. Printing a Test Plan (TRF-100 with built-in printer option only) Follow the steps below to print a test plan from the internal Flash EEPROM (TRF-100 with built- in printer option only): a. Start from the “START-UP” menu: 1.TEST XFMR...
  • Page 82 REV 1.0 TRF-100 USER’S MANUAL e. The following screen will be displayed: PRINT TEST PLAN 1.ENTER PLAN NUMBER 2.SCROLL TO SELECT 1. ENTER PLAN NUMBER Press the key (ENTER PLAN NUMBER) if you know the test plan number that you would like to print. The following screen will be displayed:...
  • Page 83: Figure 21. Sample Test Plan Printout

    TRF-100 USER’S MANUAL REV 1.0 Figure 21. Sample Test Plan Printout...
  • Page 84: Diagnostics, Verification, And Troubleshooting

    REV 1.0 TRF-100 USER’S MANUAL DIAGNOSTICS, VERIFICATION, AND TROUBLESHOOTING Performing an H and X Cable Diagnostic Test Use the steps below to perform a diagnostic test on the H and X cables: a. Start from the “START-UP” menu: 1.TEST XFMR 05/04/16 2.SETUP...
  • Page 85 TRF-100 0 USER’S MA ANUAL RE V 1.0 “NO OT OK” will be displayed d for a failed d diagnostic t test. NOTE ress any key y to return to o the “START T-UP” menu...
  • Page 86: Performing A Verification Test

    Connect the H and X cables per the on-screen instructions and then press the [ENTER] key. d. The TRF-100 will start performing a DELTA-DELTA test. The following screen will be displayed momentarily: DELTA-DELTA TEST The screen will then be updated with the test results for each phase:...
  • Page 87 TRF-100 0 USER’S MA ANUAL RE V 1.0 ress any key y to continue e. The unit w will then pro ceed to perf form a Y to Y Y test. The ollowing scre een will be d displayed mo...
  • Page 88: Appendix A - Transformer Vector Group Codes

    REV 1.0 TRF-100 USER’S MANUAL APPENDIX A – TRANSFORMER VECTOR GROUP CODES Utility power transformers manufactured in accordance with IEC specifications have a Rating Plate attached in a visible location. This plate contains a list of the transformer's configuration and operating specifications. One such rating is the winding configuration and phase- displacement code.
  • Page 89: Appendix B - Common Ansi Transformer Descriptions

    TRF-100 USER’S MANUAL REV 1.0 APPENDIX B – Common ANSI Transformer Descriptions...
  • Page 90 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 91 TRF-100 USER’S MANUAL REV 1.0...
  • Page 92 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 93 TRF-100 USER’S MANUAL REV 1.0...
  • Page 94 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 95 TRF-100 USER’S MANUAL REV 1.0...
  • Page 96 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 97: Appendix C - Cei/Iec 60076-1 Transformer Descriptions

    TRF-100 USER’S MANUAL REV 1.0 APPENDIX C – CEI/IEC 60076-1 Transformer Descriptions...
  • Page 98 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 99 TRF-100 USER’S MANUAL REV 1.0...
  • Page 100 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 101 TRF-100 USER’S MANUAL REV 1.0...
  • Page 102 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 103 TRF-100 USER’S MANUAL REV 1.0...
  • Page 104: Appendix D - Australian Std.2374 Transformer Descriptions

    REV 1.0 TRF-100 USER’S MANUAL APPENDIX D – Australian Std.2374 Transformer Descriptions...
  • Page 105 TRF-100 USER’S MANUAL REV 1.0...
  • Page 106 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 107 TRF-100 USER’S MANUAL REV 1.0...
  • Page 108 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 109 TRF-100 USER’S MANUAL REV 1.0...
  • Page 110 REV 1.0 TRF-100 USER’S MANUAL...
  • Page 111 1520 S. Hellman Ave • Ontario, CA 91761 • USA Phone: 909-923-9390 • Fax: 909-923-9391 www.vanguard-instruments.com Copyright © 2016 by Vanguard Instruments Company, Inc. TRF-100 User’s Manual • Revision 1.0 • May 9, 2016 • TA...

Table of Contents