(2) When starting up the debugging, the system automatically selects the operating mode
according to the current ambient temperature.
(3) When debugging, the front panel of the outdoor unit must be completely closed, otherwise it
will affect the accuracy of debugging (as shown in the Fig. as below).
(4) Display instruction for each stage progress at the time of debugging:
Debugging code Progress code
—
LED1
Progress
Display
Code
status
db
db
01_ set up
db
master unit
db
db
02_ allocate
addresses
db
Instruction for each stage progress at the time of debugging
LED2
Display
Code
status
ON
01
ON
ON
01
ON
ON
01
ON
ON
01
ON
ON
02
ON
ON
02
ON
GMV Heat Recovery DC Inverter VRF
Fig.4.2.1
Fig.4.2.2
Status code
LED3
Display
Code
status
A0
ON
Undebugged status.
The system hasn't set master module.
CC
ON
It needs to reset it.
The system has set more than 2
CF
ON
master modules. It needs to reset it.
Master module setting is succeeded. It
OC
ON
will automatically enter into the next
step.
The system is conducting the address
Ad
Flash
assignment.
Address assignment is succeeded. It
OC
ON
will automatically enter into the next
step.
56
Meaning
Need help?
Do you have a question about the GMVVQ224WM/C-X and is the answer not in the manual?
Questions and answers