2)
When the vacuum pump is turned off to stop vacuuming, the valve should be closed at
first and then cut off the power for the vacuum pump.
3)
Keep the vacuum for 2 hours and confirm that the pressure of the vacuum gauge has not
risen.
3.7 Additional Refrigerant Charging
3.7.1 Calculation Method of Adding Refrigerant
Total refrigerant charging amount R= Pipeline charging amount A + Σ charging amount B of every
module.
(1) Pipeline charging amount:
Pipeline charging amount A= Σ Liquid pipe length × refrigerant charging amount of every 1m liquid
pipe
Diameter of liquid
pipe (mm)
kg/m
(2) Σ Refrigerant charging amount B of every module
Refrigerant charging amount B of every
module (kg) ②
IDU/ODU rated capacity
collocation ratio C ①
50%≤C≤70%
70%<C≤90%
90%<C≤105%
105%<C≤135%
Φ28.6
Φ25.4
Φ22.2
0.680
0.520
0.350
Quantity of
22.4
indoor unit
<4
0
≥4
0.5
<4
0.5
≥4
1
<4
1
≥4
2
<4
2
≥4
3.5
Fig.3.6.2
Φ19.05
Φ15.9
0.250
0.170
Module capacity(kW)
28
33.5
40
0
0
0
1
1
1
1
1
2
1
1
2
1
1
2
2
2
4
2
2
3
4
4
5
37
Φ12.7
Φ9.52
0.110
0.054
45
50.4
56
0
0
0
1
1
1
2
2
2
2
3
3
2
3
3
4
5
5
3
4
4
5
6
6
Φ6.35
0.022
61.5
0
1.5
2
3.5
3.5
5
4
6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GMVVQ224WM/C-X and is the answer not in the manual?

Questions and answers

Table of Contents