Non-Loadbreak Dry-Well Canister Fuse Replacement Instruction (Fig. 18 B); Loadbreak Dry-Well Canister Fuse Replacement Instruction (Fig. 18 B) - DAELIM GREEN EP TECH Operation & Maintenance Manual

Single phase & three phase pad-mount liquid compartmental transformer
Table of Contents

Advertisement

Non-LoadbreakDry-WellCanisterFusereplacementinstruction(Fig.21
B):
1. De-energize transformer from a remote upstream source
2. Disassemble by loosening 4 set screws
3. Attach a hot stick to the fuse holder eye and pull out
4. Draw fuse holderout
5. Replace the fuse and reinsert the fuse with the fuse holder
6. Assemble by tightening 4 set screws
Loadbreak Dry-Well Canister Fuse replacement instruction (Fig. 21 B):
1. Disassemble by loosening 4 set screws
2. Attach a hot stick to the fuse holder eye
3. Draw fuse holder out rapidly to interrupt load "Load Break"
4. Replace the fuse and insert it rapidly " Load Make"
5. Assemble by tightening 4 set screws.
No.4 Business Building-2707, China Central Place
Chaoyang District, Beijing-100021, China
北 京 大 林 绿 源 环 保 科 技 有 限 公 司
BEIJING DAELIM GREEN EP TECH CO., LTD.
Email:info@daelim-electric.com
Fig. 21 B

Advertisement

Table of Contents
loading

Table of Contents