ACL 5100 Installation Manual page 9

Hide thumbs Also See for ACL 5100:
Table of Contents

Advertisement

Note: Must be dry contacts.
Must be in closed state
initially for controller to start
Note: Must be dry
contacts. Must
also be in closed
state for controller
to start
LG
SD
SV
SV
1 or 2 Valve System
SV
To Ignitor/Flame
Prewired in Control Box
Rod Ground
To Ignitor/Flame Rod
ACL 5100
Valve POC Switch
Remote Start Button
Remote Stop Button
HG
HT
LL
)
To PLC or
SD
SD
SD
RTU for
)
Remote
)
Status
)
120 VAC
)
120 VAC
BURNER
Power
15
Alarm
16
17
Valve
Ground
18
Bonding Ground
19
20
Solenoid HOT
(Main)
Solenoid NEU
21
Solenoid HOT
22
23
Solenoid NEU
Pilot
Red
Blue
Brown
Yellow
(High voltage ignition wire)
ACL 5100 Combustion Safety Controller
ACL 5100 Combustion Safety Controller
120/240 VAC
Proof of Closure
1
Jumper when not in use
2
Proof of Closure
Remote Start
3
Remote Start
4
5
Remote Stop
Jumper when not in use
6
Remote Stop
Shutdown
7
Jumper when not in use
8
Shutdown
9
NC
(Dry Contacts)
ALARM
COM
10
STATUS
(Changes state when running)
NO
11
12
120 HOT
13
120 NEU
14
GROUND
Field Wiring
By Customer Max 50 Ft.
Min. #16 Gauge
(Pilot)
Ignition
Module
NOTE:
preferred, the ACL 5000R remote mount kit is
available upon request.
7
Optional
Remote Mount
Ignition Module
4 Terminal Plug (provided)
Ignition
Module
15
16
High
17
Voltage
Ignition
18
Wire
Nema 4 Metal
Box Provided
If remote mounting of ignition module is
To
Ignitor/Flame
Rod
To
Ignitor
Rod
Ground

Advertisement

Table of Contents
loading

Related Products for ACL ACL 5100

Table of Contents