Set The Switches - Xylem FLYGT Concertor FPG 411 Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

1. Connect the HMI cables in parallel. Terminate the last connector in the chain
with a 120 ohm resistor between cables 2 and 4.
2. Connect the start signal cables separately.
3. Connect the Modbus cable in parallel.
4. Connect the Ethernet cable through a switch to each gateway.
5. Connect the high-level switch separately or in parallel.
6. Connect the power cable separately or in parallel.
7. Connect each analog input signal cable separately.
The analog input is applicable for FPG 412 only.

4.4 Set the switches

Set the switches.
Switch
NODE ADDRESS, 0 – 9 All the node addresses in the system must be unique and not 0.
TERM, ON/OFF
MASTER/SLAVE
FPG 411, FPG 412 Installation, Operation, and Maintenance Manual
1 2
3
4 5
1 2
Correct setting
All units in the system must have the termination switch set to the ON
position.
Not applicable
3
4 5
1 2
3
4 Electrical Installation
4 5
19