Advertisement

MBA-8
RET Operation Manual
Version 1.0
Updated: 21/8/2018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MBA-8 and is the answer not in the manual?

Questions and answers

Summary of Contents for Matsing MBA-8

  • Page 1 MBA-8 RET Operation Manual Version 1.0 Updated: 21/8/2018...
  • Page 2 The MBA-8 antenna comes with a Dual RET controller, which has 12 motorized elements. The controller has 2 inputs, IN-1 and IN-2. Each input is MRET and controls 6 elements. IN-1 controls the bottom 6 and IN-2 controls the top 6.
  • Page 3 The diagram below shows the layout of the RETs on the antenna. RET:A01 Beam 1 (P1,2) RET:A02 Beam 2 (P1,2) RET:A03 Beam 3 (P1,2) IN-1 RET:A04 Beam 1 (P3,4) RET:A05 Beam 2 (P3,4) RET:A06 Beam 3 (P3,4) RET:B01 Beam 1 (P5,6) RET:B02 Beam 2 (P5,6) RET:B03...
  • Page 4 Calibration The antenna will have to be calibrated before it can be used. This is required if manual mode was used to adjust the tilt and is a good practice to do so if the tilt has not been changed for some time. During calibration, the element will use hard-stop at the bottom to determine the zero degrees.

Table of Contents