Plumbing Requirements - Bunn SmartWave APS Installation And Operating Manual

Bunn smartwave aps: user guide
Hide thumbs Also See for SmartWave APS:
Table of Contents

Advertisement

These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi
(138 and 620 kPa) from a
brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345
kPa). The water inlet fi tting is
deionized water supply to this equipment.
NOTE - Bunn-O-Matic recommends
1
25 feet from the
" water supply line. A tight coil of tubing in the water line will facilitate moving the brewer to
2
clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water fl ow.
This equipment must be installed to comply with the Basic Plumbing Code of the
Building Offi cials and Code Administrators International, Inc. (BOCA)
and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).
Plumbing Hook-Up
1.
Flush the water line.
2.
Securely attach the Strainer/Flow Control and tube assembly to the water supply line.
3.
Securely attach tube assembly to the fl are fi tting at the rear of the brewer.
4.
Turn on the water supply.

PLUMBING REQUIREMENTS

1
" or larger supply line. A shut-off valve should be installed in the line before the
2
1
" fl are. Bunn-O-Matic does not recommend the use of a reverse-osmosis or
4
1
" copper tubing for installations of less than 25 feet and
4
Page 5
3
" for more than
8
FIG 3
40410 092407

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smart wave seriesSmart wave silver series

Table of Contents