Electrical Requirements - Bunn SLF Operating & Service Manual

Bunn slf: user guide
Table of Contents

Advertisement

USER NOTICES (cont.)
This equipment is to be installed to
comply with the Basic Plumbing Code of
the Building Officials and Code
Administrators International, Inc. (BOCA)
and the Food Service Sanitation Manual
of the Food and Drug Administration (FDA).

ELECTRICAL REQUIREMENTS

CAUTION - Do not connect the brewer to the power source until specified in Initial Set-Up.
WHITE
NEUTRAL
L1 BLACK
MODEL 15 has an attached cordset, and requires 2-wire
grounded service rated 120 volts ac, 15 amp, single phase, 60
Hz.
MODEL 20 requires 2-wire, grounded service rated 120 volts
ac, 20 amp, single phase, 60 Hz. Proceed as follows:
Electrical Hook-Up
CAUTION – Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayhead and rotate the control thermostat knob fully counterclockwise
to the "OFF" position.
4. Remove the rear panel, feed the cord through the strain relief at the rear of the brewer, and connect it to the
terminal block. Replace the rear panel.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
Replace the front panel.
6. If plumbing is to be hooked up later, make sure that the brewer is disconnected from the power source. If
plumbing has been hooked up, the brewer is ready for Initial Set-Up.
00656.0000
120V.A.C.
L2 RED
WHITE
NEUTRAL
L1 BLACK
MODEL35 requires 3-wire,
grounded service rated 120/208
or 120/240 volts ac, 20 amp,
single phase, 60 Hz. Proceed as
follows:
Page 4
12744.0000
WARNING
HOT
WATER
120 V.A.C.
208 or 240
Volts A.C.
120 V.A.C.
(Revised November 1999)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl

Table of Contents