Electrical Requirements - Bunn Dual SH BrewWISE DBC Installation And Operating Manual

Bunn dual sh brewwise dbc: operating manual
Hide thumbs Also See for Dual SH BrewWISE DBC:
Table of Contents

Advertisement

ELECTRICAL REQUIREMENTS

WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
L2 RED
L1 BLACK
GREEN
200 and 230 volt ac models
Note: This electrical service consists of 2
current carrying conductors (L1 and L2)
and a separate conductor for earth ground.
ELECTRICAL HOOK-UP (Models without power cord)
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect
electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal
electrical codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayheads to gain access to the terminal block.
4. Feed the cord through the strain relief and connect it to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-
place the front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.
ELECTRICAL HOOK-UP (Models with power cord)
WARNING – If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service
personel with a special cord available from the manufacturer or its authorized service personel in order to
avoid a hazard. Improper electrical installation will damage electronic components. Damage caused by
incorrect electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal
electrical codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
NOTE - The brewer is shipped without a plug on the power cord. Qualified service personnel must select
and install the proper UL listed grounding type attachment plug specified on the rear of the brewer.
3. Install the specified plug on the attached power cord.
4. Remove the front panel beneath the sprayheads to gain access to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumb-
ing has been hooked up, the brewer is ready for Initial Set-Up.
WARNING – Electrical connections must be made as specified above. Failure to follow these instructions can
result in personal injury, property or equipment damage.
L2 RED
L2
L1 BLACK
L1
GREEN
G
Note: This electrical service consists of 3 cur-
rent carrying conductors (Neutral, L1 and L2)
and a separate conductor for earth ground.
Page 5
L2 RED
L2 RED
WHITE
WHITE
NEUTRAL
NEUTRAL
L1 BLACK
L1 BLACK
GREEN
120/208 and 120/240 volt ac models
L2
N
L1
GREEN
G
29877-3 051007

Advertisement

Table of Contents
loading

Table of Contents