Control Board - Cdbc & Single Cd - Bunn CDBC Operating & Service Manual

Bunn cdbc: user guide
Table of Contents

Advertisement

SERVICE (cont.)
CONTROL BOARD
FIG. 2 CONTROL BOARD
Location:
The Control Board is located inside the top cover
behind the front end cap.
Test Procedures:
The test procedures for the control board will vary
depending upon the problems experienced by the
brewer. Refer to the Troubleshooting guide beginning
on page 9. The troubleshooting guide is divided into
three sections, Refill Circuit, Heating Circuit, and Brew-
ing Circuit.
Removal and Replacement:
1. Disconnect the black wire and blue wire from the
relay on the control board.
2. Disconnect the 10-pin connector and the 4-pin
connector from the main wiring harness.
3. Disconnect the 11-pin connector from the control
panel.
4. Remove the four #6 screws and four nylon wash-
ers and the two #4-40 screws securing the control
board to the end cap assembly.
5. Install a new control board and secure with the
four #6 screws and nylon washers and the two #4-
40 screws to the end cap assembly.
NOTE: The four nylon washers must be installed
under the heads of the four #6 screws to prevent
a possible shorting of the control board circuits.
6. Connect the 11-pin connector from the control
P1846
panel.
7. Connect the 10-pin connector and the 4-pin con-
nector from the main wiring harness.
8. Connect the blue wire and black wire to the relay on
the control board.
9. Refer to CDBC , SINGLE CD Adjustments and
Optional Settings to program the new control
board.
Page 23
35582 041503

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CdbcfCdbcfpCdbcpSingle cdfSingle cd

Table of Contents