Gavita Pro SL2 Series Manual page 5

Table of Contents

Advertisement

7.2
Repeater bus connection kit (optional)
The repeater bus connection kit contains the following items:
1. (1x) 25 m/82 ft cable
2. (8x) Modular jack 6P6C
3. (4x) 3-way splitter 6P6C gray
4. (2x) Snap-on ferrite black
5. (4x) Snap-on ferrite gray
7.3
Preparation for use with a controller
Using a daisy chain setup, a maximum of 100 fixtures can be connected to one controller. Up to 500 fixtures per daisy chain can
be connected when using splitters. See section 7.4 and 7.5 of this manual and the manual of the controller.
Take the unstripped black interconnect cable.
Cut the cable (supplied with controller) to the desired length and strip both ends using a crimp tool (5).
Insert the cable end in the RJ14 connectors (6) and use the crimp tool to finish the assembly.
Mount ferrite cores (item 1. mentioned in Content) to both cable ends close to the RJ14 connectors (7).
5.
7.4
Connecting up to 100 fixtures
Remove the dummy from the input port on the first fixture (8).
Note: Keep the dummy in a safe place! The dummy is necessary to operate the fixture in standalone mode.
Use the black controller cable (item is supplied with controller) to connect the controller input port on the first fixture (9A).
Remove the dummy from the input port on the second fixture.
Use a grey 6PC6 modular jack interconnect cable (item 3.) with integrated ferrite cores to connect the output port of the first
fixture to the input port of the second fixture (9B). The indicator light will blink when the connection is successful.
Repeat these steps to connect up to 100 fixtures (9C).
Warning! Ensure the power cord and the controller cables do not touch any of the reflectors.
Avertissement! Assurez-vous que le cordon d'alimentation et que les câbles de contrôle ne touchent aucun des réflecteurs.
8.
6.
A
9.
7.
B
1
2
C
max. 100

Advertisement

Table of Contents
loading

Table of Contents