Section 3 Report Information Display - Okuma OSP-E100 Instruction Manual

Table of Contents

Advertisement

SECTION 3 REPORT INFORMATION DISPLAY

Press function key [F1], [F2], or [F3], and the corresponding machining or operation report screen is
displayed.
Machining Report
The report shows the progress of each of the selected main programs.
Program progress report:
• MAIN PROGRAM
The file name of the main program having been selected.
• START DAY
Date of the main program selection [year/month/day]
• START TIME
Time of the main program selection [hour:minute:second]
• NO. OF WORK
The number of times the M02 or M30 command has been executed
Execution of the M02 or M30 command in the machine lock mode operation and dry run mode
operation (NC lathe) is not counted.
• OPERATING %
Percentage of machine operating time in reference to power ON time [%]
(Operating % = Machine operating time (OPERATING) / Power ON time (RUNNING))
• RUNNING
Length of time for which power supply to the NC has been ON [hours:minutes:seconds]
(Length of time for which main program has been selected)
• OPERATING
Length of time for which a main program has been executed [hours:minutes:seconds]
Length of time the main program has been executed in the machine lock mode or dry run mode
(NC lathe) is not counted.
SECTION 3 REPORT INFORMATION DISPLAY
4345-E P-11
Eeospkku3001
EIOSPKKU3001R01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Osp-e10

Table of Contents