Instructions For Installation; General Recommendations; Regulations For Installation; Preventative Checks And Adaptation Of The System - Alpha ARES Pro 150 Installation And Servicing Instructions

Hide thumbs Also See for ARES Pro 150:
Table of Contents

Advertisement

Technical features and dimensions
3
INSTRUCTIONS FOR
INSTALLATION
3.1

GENERAL RECOMMENDATIONS

ATTENTION!
This boiler must only be employed for its explicitly
intended use. Any other use must be considered
improper and therefore dangerous.
This boiler is used to heat water to below boiling
temperature in atmospheric pressure.
ATTENTION!
These appliances are designed exclusively for
installation inside suitable technical compartments.
Before connecting the boiler, have professionally
authorised company:
a) Accurately washing all of the pipes in the system
to remove any residues or sediments could stop
the boiler form running efficiently, even in terms
of health and hygiene.
b) Making sure the boiler is set up to operate with the
available type of fuel. The type of fuel is stated on the
packaging and technical characteristics plate.
c) Make sure that the chimney/flue has an adequate
draught, that it is not choked, and that there are no
other exhausts for other appliances, unless the flue
is designed for multiple utilities, in accordance with
standard specifications and requirements in force.
Only once this check has been carried out can the
fitting between boiler and chimney/flue be set up.
ATTENTION!
In rooms with aggressive vapour or dust, the
appliance must operate independently of the air in
the room of installation!
ATTENTION!
The appliance must be installed by an authorised
company possessing professional-technical
qualifications in accordance with the law, who, under
his/her own responsibility, enforces the observance of
regulations according to the rules of good practice.
ATTENTION!
Assemble the appliance in observance of the minimum
required distances for installation and maintenance.
The boiler must be connected to a heating system
compatibly with its specifications and power.
3.2

REGULATIONS FOR INSTALLATION

Installation must be carried out by a
who is in charge of enforcing observance of all local and/or national
laws published in the Official Gazette, as well as all applicable technical
regulations.
3.3
PREVENTATIVE CHECKS AND
ADAPTATION OF THE SYSTEM
When the appliance is installed on existing systems, make sure that:
- The flue is suitable for condensation appliances, for the temperatures
of the combustion products, calculated and built in accordance with
regulations in force. That is it a straight as possible, water-tight and
insulated and does not have any obstructions or constrictions.
- The flue is equipped with an attachment to evacuate the condensation.
The boiler room is equipped with a pipe for the evacuation of the
condensation produced by the boiler.
- The electrical system is built in accordance with specific regulations
and by professionally authorised company.
- The flow rate, head and direction of flow of the circulation pumps is
appropriate.
- The fuel feed line and any existing tanks are set up in accordance with
regulations in force.
- The expansion vessels ensure complete absorption of the dilation of
the fluid contained in the system.
- Slurry and build-up have been cleaned out of the system.
If it is possible to schedule the replacement, the system must be washed
preventively with alkaline dispersants.
Washing must be carried out four weeks prior to replacement, with a
system operating between 35°C - 40°C.
Attention! If the new boiler has been replaced in an old system without
having preventively washed it as described above, do not wash the sy-
stem, as any residues of the product in the circuit may fill the generator
with residues after replacement.
It is advisable to contact a company specialised in water treatment.
16
professionally authorised
company,

Advertisement

Table of Contents
loading

Table of Contents