Connecting Refrigerant Pipes And Drain Pipes; Refrigerant Piping Work; Drain Piping Work; Confirming Drain Discharge - Mitsubishi Electric City Multi PLFY-P-NLMU-E Installation Manual

Air-conditioners for building application, indoor unit
Hide thumbs Also See for City Multi PLFY-P-NLMU-E:
Table of Contents

Advertisement

Available languages

Available languages

[Fig. 6.3.1] (P.4)
"0-0 gas" mark
"OUTER" mark
Refrigerant piping (gas)
Field refrigerant piping
Insulation material
Pull in this direction.
Flare
Move to the original position.
[Fig. 6.3.2] (P.4)
(figure showing the flare insulation)
Field refrigerant piping
Unit body plate
INNER
Provided flare insulation (2)

7. Connecting refrigerant pipes and drain pipes

7.1. Refrigerant piping work

This piping work must be done in accordance with the installation manuals for
both outdoor unit and BC controller (simultaneous cooling and heating series
R2).
Series R2 is designed to operate in a system that the refrigerant pipe from an
outdoor unit is received by BC controller and branches at the BC controller to
connect between indoor units.
For constraints on pipe length and allowable difference of elevation, refer to
the outdoor unit manual.
The method of pipe connection is flare connection.
Cautions on refrigerant piping
Be sure to use non-oxidative brazing for brazing to ensure that no for-
eign matter or moisture enter into the pipe.
Be sure to apply refrigerating machine oil over the flare connection
seating surface and tighten the connection using a double spanner.
Provide a metal brace to support the refrigerant pipe so that no load is
imparted to the indoor unit end pipe. This metal brace should be pro-
vided 50 cm [19-11/16 in] away from the indoor unit's flare connection.
Warning:
When installing and moving the unit, do not charge it with refrigerant other
than the refrigerant specified on the unit.
-
Mixing of a different refrigerant, air, etc. may cause the refrigerant cycle to
malfunction and result in severe damage.
Caution:
• Use refrigerant piping made of phosphorus deoxidized copper and cop-
per alloy seamless pipes and tubes. In addition, be sure that the inner
and outer surfaces of the pipes are clean and free of hazardous sulphur,
oxides, dust/dirt, shaving particles, oils, moisture, or any other contami-
nant.
• Never use existing refrigerant piping.
- The large amount of chlorine in conventional refrigerant and refrigerator oil
in the existing piping will cause the new refrigerant to deteriorate.
• Store the piping to be used during installation indoors and keep both
ends of the piping sealed until just before brazing.
- If dust, dirt, or water gets into the refrigerant cycle, the oil will deteriorate
and the compressor may fail.
• Use Suniso 4GS or 3GS (small amount) refrigerator oil to coat the flare
and flange connection part. (For models using R22)
• Use ester oil, ether oil or alkylbenzene (small amount) as the refrigerator
oil to coat flares and flange connections. (For models using R410A)
- The refrigerant used in the unit is highly hygroscopic and mixes with water
and will degrade the refrigerator oil.

7.2. Drain piping work

[Fig. 7.2.1] (P.4)
A:
25 cm [9-27/32 in]
B:
1.5 – 2 m[4-7/8~6-1/2 ft]
Downward slope of more than 1/100
Insulating material
Metal brace
10
"INNER" mark
Flare insulation (2)
Refrigerant piping (liquid)
Pipe insulation (1)
Flare
Insulation material
There must be no gap.
There must be no gap.
OUTER
Unit body
[Fig. 6.3.3] (P.4)
Tape (3)
Provided tie band (4)
Notes:
*1
Insert the flare nut into the field refrigerant piping. Pull the insulation
material back at the area where it will be flared, then return it to its
original position after performing the flare work.
Exposing copper piping may result in condensation forming. Be
extremely careful when performing this operation.
*2
There must be no gap.
*3, *4 There must be no gap. Slit should be on the top.
[Fig. 7.2.2] (P.4)
Indoor unit
Take as large as possible. About 10 cm [3-15/16 in]
Collected pipes
[Fig. 7.2.3] (P.4)
C:
28 cm [11-1/32 in]
D:
170 ± 5 mm [6-23/32 ± 7/32 in]
Drain hose (Accessory)
Be sure to use the supplied drain hose (Accessory).
Less than 300 mm [11-13/16 in]
Hard vinyl chloride 90° elbow (field supply)
Hard vinyl chloride (VP-25) (field supply)
Tie band (small) (Accessory)
Connect each connection with vinyl chloride adhesive. But never use
any adhesive over the indoor unit discharge port. Otherwise the drain-
up mechanism cannot be serviced later. Also, the end connection may
be eroded by resin and so cracked.
1. Ensure that the drain piping is downward (pitch of more than 1/100) to the
outdoor (discharge) side. Do not provide any trap or irregularity on the way.
(A)
2. Ensure that any cross-wise drain piping is less than 20 m [65 ft] (excluding
the difference of elevation). If the drain piping is long, provide metal braces to
prevent it from waving. Never provide any air vent pipe. Otherwise drain may
be ejected.
3. Use a hard vinyl chloride pipe VP-25 (with an external diameter of 32 mm
[1-9/32 in]) for drain piping.
4. Ensure that collected pipes are 10 cm [3-15/16 in] lower than the unit body's
drain port as shown in B.
5. Do not provide any odor trap at the drain discharge port.
6. Put the end of the drain piping in a position where no odor is generated.
7. Do not put the end of the drain piping in any drain where ionic gases are gen-
erated.
8. The intake of the drain piping can be made 28 cm [11-1/32 in] higher than the
drain discharge port. If there are some obstacles under the ceiling, use
elbows to make it at least height according to the site. (C)
Note:
If the rise portion is long, there will be a lot of returned water in an opera-
tion stop, generating slime or odor during off-season. Ensure that the rise
portion is at a minimum.
Caution:
Pipe the drain piping to ensure that it discharges drain, and insulate it to
prevent dew condensation. A failure to the piping work may cause water
leakage and so wet your property.

7.3. Confirming drain discharge

Make sure that the drain-up mechanism operates normally for dis-
charge and that there is no water leakage from the connections.
Be sure to confirm the above in a period of heating operation.
Be sure to confirm the above before ceiling work is done in the case of a new
construction.
Fasten with tape.

Advertisement

Table of Contents
loading

Table of Contents