Riello BAG2 MIX Instructions For The Installer And The Technical Assistance Service page 46

Table of Contents

Advertisement

Available languages

Available languages

2. Connect the bipolar black cable with prods to the boiler's M2 board (fig. 6).
Boilers from inside
Fig. 6
3. Connect the probe wiring and thermostat to CN6 connector of BE08
Connect the prods to the M10 boiler board (fig. 7).
Connect the shielded cable connector (on the
Fig. 7
Connection to the
BAG
2
MIX sensor
46
INSTALLATOR
Boilers from inside
Boilers from outside
2
BAG
MIX
part) to the NTC probe and the other to the thermostat.
Boilers from outside
Connection to the
2
BAG
MIX sensor

Advertisement

Table of Contents
loading

Table of Contents