Page 4
12. All wire rope terminations of the suspension line required to 2017. be tested prior to being used for the first time. The 5. Tractel is a certified ISO 9001 quality management employer must keep the testing record available to an company. The platform modular sections and stirrups are inspector on request at project site fabricated under our quality program.
11. Maintenance may only be carried out by personnel 18. Every suspended job must be placed under the control of authorized by Tractel. A signed a dated inspection record a person having the required competence and authority should be maintained.
Page 6
Tractel engineering scaffold installation. Whenever calculations and department specific rigging and handling are involved, the operator 22.
Page 10
(4M) (247) (450) (239) (450) (262) (450) (254) (450) not listed in this table must be consulted with Tractel for their project specific requirements. ↑2-3↑ ↑2+3↑ 16’6” 16’ 0” 1000 1000 16’ 2” 1000 1000 3) Platforms longer than 12M (39.5 feet) meeting ↑1-3-1↑...
Page 11
E↑3-3-2-3↑E 35’ 4” E↑3+3+2+3↑E 35’ 10” (11M) (422) (450) (445) (450) (471) (340) (494) (340) this table must be consulted with Tractel for their project specific 39’ 6” 1000 1018 1081 1131 E↑3-3-3-3↑E 38’ 8” E↑3+3+3+3↑E 39’ 2” requirements. (12M) (440) (450)
Page 12
Any other work cage stirrup platform configurations ↑ ↑ (2M) 6’6” (192) (227) 6’6” (194) (227) not listed in this table must be consulted with Tractel for their project specific requirements. ┴ ┴ Legend: ↑ Stirrup 2 2M Modular E End Frame 1 1M Modular ┴...
Page 16
Use only the 5/8 inch diameter gravity lock pins and connectors supplied by Tractel. Make sure that the pins are not worn, bent or otherwise damaged. Never substitute alternative pins, bolts or connectors.
Page 17
Do not hammer or force the pins into place. b. Use only the 5/8 inch diameter gravity lock pins and connectors supplied by Tractel. Make sure that the pins are not worn, bent or otherwise damaged. Never substitute alternative pins or bolts.
Page 18
Do not hammer or force the pins into place. b. Use only the 5/8 inch diameter gravity lock pins and connectors supplied by Tractel. Make sure that the pins are not worn, bent or otherwise damaged. Never substitute alternative pins or bolts.
Page 25
- Inspection is to be carried out by competent person before WARNING: each rigging of the platform. - Inspection by persons authorized by Tractel, is to be carried out once every six months or every 200 Ensure that the distance (a) between the suspension hours.
Page 40
Toll Free 1-800-561-3229 Tel: (514) 493-3332 Fax: (514) 493-3342 As we are dedicated to continuous improvement of our products, the TRACTEL ® reserves the right to modify the specifications of the equipment described in this manual. As a result, illustrations may not represent exactly the product you receive: components and/or design may differ.
Need help?
Do you have a question about the skysafe MP 03 and is the answer not in the manual?
Questions and answers