Initial Inspection And Assembly; Mounting Procedure - JENCO 6309 POT Operation Manual

Microcomputer based ph /orp/ temperature controller
Table of Contents

Advertisement

I. INITIAL INSPECTION and ASSEMBLY
Carefully unpack the instrument and accessories. Inspect for
damages made in shipment. If any damage is found, notify your
Jenco representative immediately. All packing materials should be
saved until satisfactory operation is confirmed.

MOUNTING PROCEDURE

controller to the mounting panel.
Warning:
If the equipment is used in a manner not specified by the
manufacturer, the protection provided by the equipment may be
impaired.
Cleaning the instrument:
1. Be sure to remove the power before attempting to clean the
meter.
2. Use a lint free cloth and clean water or neutral detergent.
3. Wipe the outer surface of the instrument only.
4.
Wipe-dry the instrument before powering again.
3
1. Make a cutout on
any panel, with a
thickness of 1/16 in.
(1.5 mm) to 3/8 in.
(9.5mm).
2. Remove the
mounting assembly
from the controller
and insert the
controller into the
cutout.
3. Replace the
mounting bracket
assembly onto the
controller and
secure the

Advertisement

Table of Contents
loading

Table of Contents