Connection To A Sealed Flue System - Daikin Rotex GW-20 C22 Installation Instructions Manual

Wall-mounted gas condensing boiler
Hide thumbs Also See for Rotex GW-20 C22:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 56
5.10

Connection to a sealed flue system.

5.10.1
Pipe lengths
As the resistance of the flue tube and air supply pipes increases, the power of the unit will
decrease. The maximum permitted power reduction is 5%.
The resistance of the air supply and the combustible gas outlet depends on the length, diameter
and all components of the pipe system. Per unit category, the total permitted pipe length has been
indicated for the air supply and the combustible gas outlet.
5.10.2
Permitted pipe lengths in concentric flue tube systems
Permitted pipe lengths when applying concentric 60/100
C13
RKOMB22AAV1
10 m
RKOMB28AAV1
10 m
RKOMB33AAV1
10 m
Permitted pipe lengths when applying concentric 80/125
C13
RKOMB22AAV1
29 m
RKOMB28AAV1
29 m
RKOMB33AAV1
29 m
Contact the manufacturer for test calculations for the resistance of the air supply and
combustible gas outlet pipe and the wall temperature at the end of the combustible gas
outlet pipe.
Replacement lengths
Bend 90°
R/D=1
Bend 45°
R/D=1
Knee 90°
R/D=0.5
Knee 45°
R/D=0.5
General assembly:
For all outlets, the following assembly applies:
1.
Slide the concentric combustion gas outlet pipe and air supply pipe.
2.
Slide the concentric pipes into each other.
From the unit, every pipe has to be slid into the previous one.
3.
Mount a non-vertical combustion gas outlet pipe on a slope towards the unit
(min. 5mm/m).
4.
Fit the assembly brackets in accordance with the assembly instructions of the supplier
of the air supply/flue tube system.
C33
11 m
10 m
10 m
C33
C93
29 m
See par. 5.10.8
29 m
See par. 5.10.8.
29 m
See par. 5.10.8
2 m
1 m
4 m
2 m
29

Advertisement

Table of Contents
loading

Table of Contents