Operation - Okoia UB10 Operating Instructions Manual

Heating underblanket
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
2. Remove ties from the tie cords.
3. Pass the middle tie cord under the
middle of the mattress and through
the middle eyelet on the opposite
side. Tie tightly.
• Mattress can be very heavy. Two
people are recommended when
lifting the mattress and tying down
the underblanket.
4. Pass the end tie cord under the
corresponding bottom corner of the
mattress and through the end eyelet,
pass under the bottom corner of the
mattress and through the bottom side
eyelet. Tie tightly.
5. Repeat step 4 for the tie cord at the
top end.
6. Connect the power cable connector
to the underblanket connector.
• Make sure it is securely connected.

OPERATION

1. Plug the power lead into the closest mains socket.
Preheating the bed
2. Move the heat setting on the controller(s) to heat level 3.
• It is recommended to preheat the bed for approximately 30-60 minutes. The
time may vary depending on the room temperature and type of the bedding
used.
• DO NOT SLEEP WITH THE UNDERBLANKET ON THE PREHEAT SETTING.
EG-6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ub20

Table of Contents