Bearing Frame Overhaul - GE OSMONICS TONKAFLO SS Series Installation, Operation And Maintenance Manual

High-pressure centrifugal pumps with e-bearing frames
Table of Contents

Advertisement

2.
Remove retaining ring #1 from the bearing frame as shown on Figure

6.10 (Bearing Frame Overhaul).

3.
Remove the lock nut, lock washer and flat washer from the bearing
frame shaft.
4.
Place the bearing frame in a press. Simultaneously press out the oil
seal holder and remove bearing cone #2 from the shaft by pressing on
the motor end of the bearing frame shaft. After the oil seal holder is
removed, continue pressing to remove the shaft assembly from the
bearing frame. Bearing cone #1 will remain on the shaft. Removal of
bearing cone #1 from the shaft should be done only when
replacement is necessary.
Bearing Frame Overhaul
5.
Inspect the bearing cups and cones for any rough surface conditions
and replace both cup and cone when necessary. Pitted and galled
rollers and/or bearing cap indicate replacement is necessary. Very
light marks around each roller may occur during "break-in period"
from the bearing cage. This is not a problem and bearing replacement
is not necessary.
Figure 6.10
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents