4.3

Initial Operation

With the oiler installed and filled, oil level set, pump primed, and pump rotation
checked, your pump is ready to operate.
Upon start-up, check to see that the correct boost pressure level is obtained at design
flow and that oil droplets form in the oil eye (Section 3.12, Lubrication of Pump
Bearings).
If prime was not achieved, reprime as necessary.