GE Baker Hughes Druck PV 411A Instruction Manual

GE Baker Hughes Druck PV 411A Instruction Manual

Pneumatic/hydraulic hand-pump
Hide thumbs Also See for Baker Hughes Druck PV 411A:

Advertisement

Quick Links

Druck PV 411A
Pneumatic/Hydraulic Hand-pump
Instruction Manual
English
1 - 14
Deutsch
15 - 28
Español
29 - 42
Français
43 - 56
Italiano
57 - 70
Lietuvių
71 - 82
Norsk
83 - 94
Português
95 - 108
Русский
109 - 124
125 - 136
137 - 150
BHGE Data Classification: Public
www.gemeasurement.com

Advertisement

Table of Contents
loading

Summary of Contents for GE Baker Hughes Druck PV 411A

  • Page 1 Druck PV 411A Pneumatic/Hydraulic Hand-pump Instruction Manual English 1 - 14 Deutsch 15 - 28 Español 29 - 42 Français 43 - 56 Italiano 57 - 70 Lietuvių 71 - 82 Norsk 83 - 94 Português 95 - 108 Русский 109 - 124 125 - 136 137 - 150...
  • Page 3 © 2000 Baker Hughes, a GE company – All rights reserved. PV 411A Instruction Manual-English | i...
  • Page 4 | PV 411A Instruction Manual-English © 2000 Baker Hughes, a GE company – All rights reserved.
  • Page 5: Toxic Materials

    A qualified technician must have the necessary technical knowledge, documentation, special test equipment and tools to carry out the required work on this equipment. © 2000 Baker Hughes, a GE company – All rights reserved. PV 411A Instruction Manual-English | 1...
  • Page 6: Technical Advice

    International Standards Organization kilogram metre millimetre MSDS Material Safety Data Sheet National Pipe Thread pressure relief valve pounds per square inch 2 | PV 411A Instruction Manual-English © 2000 Baker Hughes, a GE company – All rights reserved.
  • Page 7 A pressure relief valve (8) can be adjusted to set a pressure between 30 and 700 bar (500 to 10,000 psi). © 2000 Baker Hughes, a GE company – All rights reserved. PV 411A Instruction Manual-English | 3...
  • Page 8: Operation

    In vacuum mode, the air/fluid flow is reversed as air/fluid is drawn in through the top and rear outlet ports (2 and 6) and expelled through the inlet port (1). 4 | PV 411A Instruction Manual-English © 2000 Baker Hughes, a GE company – All rights reserved.
  • Page 9: Connecting The Pump

    Placing the pump on the bench allows greater force to be applied to the scissor- action handles. Internal stops prevent further rotation of the pump head. Note: Do not use excessive force when rotating the pump head. © 2000 Baker Hughes, a GE company – All rights reserved. PV 411A Instruction Manual-English | 5...
  • Page 10: Pneumatic Operation

    Turn the selector valve fully counterclockwise (out) position. Turn the volume adjuster to the mid-position. In this position fine adjustments of the generated vacuum can be made. 6 | PV 411A Instruction Manual-English © 2000 Baker Hughes, a GE company – All rights reserved.
  • Page 11 Alternatively, vent atmosphere into the vacuum by slowly turning (counterclockwise) the selector valve (7) to the center position. After completion, depressurize the pump and disconnect from the pipes and equipment. © 2000 Baker Hughes, a GE company – All rights reserved. PV 411A Instruction Manual-English | 7...
  • Page 12: Hydraulic Operation

    Note: Demineralized water is used to test the pump at manufacture. On shipment, there will be traces of demineralized water in the system. 8 | PV 411A Instruction Manual-English © 2000 Baker Hughes, a GE company – All rights reserved.
  • Page 13: Priming The System

    If necessary, top-up the reservoir to the 2/3 level with clean fluid. Secure the reservoir cover by tightening the reservoir cover lock nut (1). © 2000 Baker Hughes, a GE company – All rights reserved. PV 411A Instruction Manual-English | 9...
  • Page 14 Loosen the two PRV locking screws (1). Loosen the PRV lock nut (2) by turning clockwise. Set the relief pressure by turning the PRV adjusting nut (3). 10 | PV 411A Instruction Manual-English © 2000 Baker Hughes, a GE company – All rights reserved.
  • Page 15: Fault Finding

    Check PRV pressure setting. If, for any reason, a fault occurs within the pump, it is recommended that the equipment be returned to an appointed agent. © 2000 Baker Hughes, a GE company – All rights reserved. PV 411A Instruction Manual-English | 11...
  • Page 16: General Specification

    This value assumes atmospheric pressure at 1 bar (14.5 psi) and varies depending on atmospheric pressure. 6. Returned Goods Procedure If the unit requires calibration or is unserviceable, return it to the nearest GE Service Centre listed at: www.gemeasurement.com Contact the Service Department to obtain a Return Authorization (Worldwide excluding USA).
  • Page 17: Safety Precautions

    Service by unauthorized sources will affect the warranty and may not guarantee further performance. You must inform GE if the product has been in contact with any hazardous or toxic substance. The relevant COSHH or in the USA, MSDS, references and precautions to be taken when handling.
  • Page 18 14 | PV 411A Instruction Manual-English © 2000 Baker Hughes, a GE company – All rights reserved.

Table of Contents