Instruction For Assembling - Joannes GIG K Series Installation & Maintenance

Cast iron boiler for high efficiency
Table of Contents

Advertisement

Available languages

Available languages

22

INSTRUCTION FOR ASSEMBLING

1 The boiler may be supplied:
as a set of elements, in 4 separate boxes, containing the Casing, Control panel, Elements, and accessories
for assembling the elements. Please follow the instructions enclosed with the set of elements to assemble the
boiler body. Follow the instructions below to assemble the casing and control panel.
With the body already assembled, in 3 separate boxes containing the Casing, Control panel and Boiler
body. Follow the instructions below to assemble the casing and the control panel.
2 Prepare the right and left sides, choosing the quantity of side panels according to the dimensions of the
boiler (see table).
3 Connect the panels together, using the screws 1, the washers 2 and the nuts 3, reinforcing the bottom parts
using the blades 4 fastened with the screws 5.
Fig. 3
Description
Pos
Casing lateral front left
60
Casing front top
61
Casing front bottom
62
Casing lateral front right
63
Casing lateral right and left design 1
64
Mounting plate for casing lateral
65
Casing lateral right and left design 2
66
Casing lateral right and left design 3
67
Socket-type clamp
68
Casing rear top
69
Strain relief
71
Casing top design 3
72
Supporting plate for casing rear
73
Casing top design 2
74
Casing top design 1
75
Fig. 4

Advertisement

Chapters

Table of Contents
loading

Table of Contents