Setting Out Your Installation; Full Box Half Box - Garage Door Systems ThermaRoll 55 Installation Instructions Manual

Roller garage door
Table of Contents

Advertisement

Your door has been supplied with either an optional Full or standard Half box pre-assembled to the
endplate - your overall size is pre-set.
Put cardboard protection down first. Place box on the floor against the opening where the door is to be
fitted, ensure overlap is equal on each side and mark a plumb line 'A' up each wall at the outside edge of
the box.
This is your outside edge of guide mark.
!
Fit base of
guide level
with the highest
point of the
floor surface
DO NOT fit
guide in recess
left by removal
of timber frame
8

SETTING OUT YOUR INSTALLATION

FULL BOX & HALF BOX
IMPORTANT – FLOOR IS FLAT AND LEVEL
A
!
!
Floor
Floor

Advertisement

Table of Contents
loading

Table of Contents