Energizing the Incoming MV Cables
M
f
PHASE CONFORMITY TEST
Serial Light
If the phases matching, light is OFF .
If the phases not maching, light is ON.
(Test device is optional.)
CABLE TEST
Incoming / outgoing switchgear
To check cable faults & insulation
•
Turn the disconnector OFF .
•
Turn the earthing disconnector ON.
•
Open the switchgear front cover.
•
Place the cable test device (Test rod as optionally.)
•
Turn the switch OFF .
•
Perform the required test for check the cable healthy.
f
Ulusoy URING36 - LLF - 3 Way Compact Switchgear with Fuse User Manual May 2020 www.eaton.com
I
Voltage Indicator
When MV cables are powered, voltage indicator
lights must be on.
Incoming switchgear
To check cable faults & insulation.
•
Turn the disconnector OFF .
Switch-OFF the power of the switchgear from previous center
•
•
Turn the earthing disconnector ON.
Open the switchgear front cover.
•
Place the cable test device.
•
Turn the earthing disconnector OFF from both sides.
•
•
Perform the required test.
LBS is ON / OFF
Earthing switch
ON / OFF
9