DGC ZM-DGC900 Manual page 21

Bga rework station
Table of Contents

Advertisement

14
RL01
First
(AL1)
15
RL02
Second
(AL2)
16
R—H
Automatic/Manual
17
Prt
Time unit of curve
procedures
18
Rct
Way of control
19
H,L
Max range of linear
input
20
LOL
Min range of linear
input
21
FIL
Digital
syatem
22
Proc
linear
progamming check
h. Program configuration notes
Basic parameters: Sn, Ctrl, OP1, OP2
Sn, Ctrl, OP1, OP2 are the basic four parameters. They have great impact on other parameters.
Therefore, we should set these four basic parameters first, according to the specific requirements.
Output parameters: OP1, OP2, Hct.Cct
When setting OP1 and OP2, be sure to choose the right output module. If the output module is
a relay, logic level module or SCR zero module, then OP1 should be set at Time proportion output.
If we choose circuit output module, the OP1 should be set at 4-20mA or 4-20mA output.
When we choose time proportion output, we should set Hc,t.cc,t. If we choose SSR(solid-state
relay) or SCR zero module, the action period can be set at 2s; if we choose relay to output, the
action period should be no less than 20s.
Regulation parameter: ProP.ln と, と,dEr, と,rEL.C
ProP, ln とと,dEr と, rEL.C are the four regulation parameters, directly affecting control
precision.
RL02
on
alarming
LoRL
HdR
LdR
ndRo
alarming
Pout
Auto
Hand
Nln
Sec
rEu
Dlr
-1999~9999
-1999~9999
filtering
P1
input
P2
21
Second alarming output
Action (suction)
Under bottom-
When the OP2 is the
line alarming
second alarming, AL02
Over
top
display on the screen.
deviation-line
alarming
Under
bottom
deviation-line
alarming
Within
deviation
alarming
Out-of
deviation
alarming
Curve
procedure over
alarming
No auto/hand shift
Auto allowed/hand shift
Min
Sec
Positive control
Negative control
Only when the input signal is linear
input,it will display L1n or PrE.

Advertisement

Table of Contents
loading

Related Products for DGC ZM-DGC900

Table of Contents