Instruction manual AQ101, AQ101D, AQ110P, AQ01
7
T
ECHNICAL DATA
7.1
AQ101, AQ101D, AQ110P
7.1.1
M
OUNTING AND INSTALLATION
Panel thickness (min-max):
Panel mounting screw type:
Tightening torque (min-max):
Tightening torque (min-max):
Connectors X1 and X2 type:
Wire cross section (solid and multicore) (min-max):
Screw tightening torque (min-max):
Connector X3 (AQ110P only)
Wire cross section (solid and multicore) (min-max):
Screw tightening torque (min-max):
7.1.2
O
PERATION TIMES
Tripping time using HSO (AQ110P only):
Tripping time using mechanical relays (T1-T4):
Overcurrent measurement (AQ110P only):
Protection stages active after energization:
*) Total trip time using arc light (L>) or phase/residual overcurrent (I>) and arc light (L>)
ARC FLASH PROTECTION RELAYS
Panel material:
Key size:
Grounding nut type:
Key size:
Minimum stripping length:
Minimum stripping length:
Fiber connectors
Nut tightening torque:
Reset time
Light activation:
Metal panel
1.0 – 5 mm / 1/16" – 13/64"
ISO 14581-M4x12 galvanized
Torx T20
1.5 – 2.0 Nm / 13 – 18 in-lbs
DIN934-M5 galvanized
8
2.5 – 3.0 Nm / 22 – 26 in-lbs
Phoenix contact MSTB 2,5/15-ST-5,08
0.2 – 2.5 mm2 / 24-12 AWG
7 mm / 0.275"
0.5 – 0.6 Nm / 4.4 – 5.3 in-lbs
0.5 – 6.0 mm2 / 20 – 10 AWG
14 mm / 0.55"
0.5 – 0.6 Nm / 4.4 – 5.3 in-lbs
Light finger tightening
2 ms*
7 ms*
1 ms
50 ms
50 ms (typically)
)
33 (48