Other Control; Initial Setup - LG MULTI V Service Manual

Hide thumbs Also See for MULTI V:
Table of Contents

Advertisement

Function

4. Other control

4.1 Initial setup

There are 4 initial setup steps before running.
All DIP switch setting must be completed before initial setup.
1) Step 1 : factory setting value display
Factory setting value is displayed in 7 segment on PCB for 24 seconds.
All dip switches must be set properly before step 1.
Power is on
Master model code is displayed (3 seconds)
Blank(6 seconds)
Total capacity including sub units is
displayed (2 seconds)
Heat Pump : Display 2 is default value
Heat Recovery : Display 3 is default value
Power type
Model type
(In case of 5 TON : 07)
- 26 -
Copyright © 2020 LG Electronics Inc.
All rights reserved. Only training and service purposes.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents