What You Need; Step 1: Prepare The Rack; Step 2: Install The Rails; Step 2A: Separate The Inner And Outer Server Rails - Hitachi HCP Anywhere Edge On-Site Setup And Recovery

Table of Contents

Advertisement

What you need

What you need
To mount the HCP Anywhere edge appliance into a rack, you need:
#1 Phillips screwdriver
Tip: The hardware assembly is easiest with a magnetic screwdriver.
Velcro straps
Cable ties

Step 1: Prepare the rack

Remove the doors and sides from the rack.

Step 2: Install the rails

Continue the assembly by installing the server mounting rails.
To install the rails:
1. Separate the inner and outer server rails
2. Attach the inner rails to the server
3. Install the outer rails in the rack

Step 2a: Separate the inner and outer server rails

A server rail kit consists of two sets of inner and outer rails. The rails are
universal; that is, each set of rails can be used for either the left or right
side of the server.
In a new server rail kit, the inner rails are nested inside the outer rails. You
need to separate them so that you can attach the inner rails to the server
and the outer rails in the rack.
14
Chapter 2: Mounting the HCP Anywhere edge appliance into a rack
HCP Anywhere Edge Appliance On-Site Setup and Recovery

Advertisement

Table of Contents
loading

Table of Contents