Download Print this page

Prima FIT II Installation Instruction page 7

Advertisement

IMPORTANT Please read these instructions prior to installation. Refer to the Prima catalog for proper lamp type and maximum wa
which lamps we support and proper usage. Prima low voltage transformers must be used with all Prima Lighting product installations. All warranties
are void if Prima transformers are not used. Prima's catalogs provide general information and suggestions for proper dimmer usage. Please consult
Support points are required along the FIT System track run at 4ft maximum intervals. When using connectors, supports must be installed on the connector
or within 6" of the connector. Additional supports may be required when using certain glass pendants. It is strongly recommended that gloves are used when
handling the FIT II System track. Oils and dirt from ngers can sometimes permanently mark the nish. Track should be cleaned with a damp cloth and thoroughly
dried before xture installation.
Be sure that the items indicated below are included in the package. Mount screw anchors in the mounting surface so that they align with
G
the holes in the mounting disk. Secure the mounting disk to the mounting surface with the included screws. Secure the track with the
locking knob. Insert the knob into the large hole on the side of the track bracket. Rotate the track locking knob 90º clockwise to lock the track.
for stem support
Anchors
Mounting
screws
Insert the track into the
G3
track bracket
G4
end power feed -
FIT II System end power feeds are available in one model which have powerfeed entry on the end (22-79121 shown in the example below)
H
the side (22-79122) or the top (22-79123). Insert the connector into open end of a FIT track length. Secure the powerfeed by tightening the
set screws with a at head screwdriver at the top and bottom of the connector. Insert the transformer's low voltage secondary leads into the power
entry holes on the connector. Using the supplied hex wrench, secure the transformer leads by tightening two set screws for each wire lead.
Transformer low voltage leads must be 10 AWG THHN stranded.
Mounting stem assembly
w/ mounting disk and
track bracket
Locking knob
G5
Insert locking knob
90º clockwise
(22-79121, 22-79122, 22-79123)
13615 Marquardt Ave. Santa Fe Springs, CA 90670
Ph. 562-407-3079 . Fx. 562-407-3069
www.primalighting.com
G1
G2
G6
Tighten inner knob
Low voltage leads from
transformer. 10AWG THHN
stranded
atest updates on
improper
s prior to installation.
(22-65240 ~ 22-65248)
Tighten screws
on both sides
Tighten
screws
on both
sides
Rev. 021408
REV. 052416

Advertisement

loading

Related Products for Prima FIT II