Use; Daily Operation; Manual Powering - La Cimbali M39 GT R2 Use And Installation

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 43

USE

10. Daily operation

"Before setting the machine to work, make
sure that:
- the main electric power switch is on;
- the mains water tap has been turned on".

MANUAL POWERING

Press the luminous main switch (1) to turn on the machine.
The the key LEDs light up and the following message will
appear on the display (16):
21
September
wednesday
CHECK BOILER
The entire time that the message remains on the display
screen, the volumetric pump continues to function, which
not activated when there is no water in the boiler.
After this phase, all heating elements start to heat. The
boiler temperatures are shown at the center of the display:
21
September
wednesday
29.6°C
The machine is ready to work when the display (16) indicates
the working pressure:
21
September
wednesday
2015
15:15:04
2015
15:15:04
28.4°C
30.4°C
2015
15:18:12
ON
1
10 EN
16
C

Advertisement

Table of Contents
loading

Table of Contents