AP PAR ATU S CO NTR O L T E S TI NG
Step 2/6
Insert the earthing switch crank on the shaft. Check the status on the protection relay LHMI.

Figure 52: Single line diagram, the earthing switch shutter is open

Step 3/6
Check that the circuit breaker cannot be moved into service position when the earthing
switch crank is inserted.
Step 4/6
Remove the earthing switch crank from the shaft. The shutter must be closed. Check the
earthing switch status on the protection relay LHMI.

Figure 53: Single line diagram, the earthing switch shutter is closed

1 VLG 500 0 17 C
PA N E L I NT ER N A L I NT ER LO C KI NG