Inspection Checklist - SPX MARLEY CP User Manual

Cooling tower
Table of Contents

Advertisement

inspection checklist

Date Inspected
Owner
Owner's Tower Designation
Tower Manufacturer
Process Served by Tower
Design Conditions
m
Number of Fan Cells
Condition: 1—Good
Structure
Casing Material
Structural Material
Fan Deck Material
Stairway?
Material
Ladder?
Material
Handrails?
Material
Interior Walkway?
Cold Water Basin Material
Water System
Distribution System
Header Material
Manifold Material
Branch Arms
Nozzles — Orifice Diameter
Heat Transfer System
Fill
Eliminators
Inlet Face of Fill
Use this space to list specific items needing attention:
16
/hr
HW
3
2—Keep an eye on it
Material
Inspected By
Location
Model No.
Operation:
Continuous
°C
CW
3—Needs immediate attention
1 2 3
Serial No.
Intermittent
Seasonal
°C
WB
°C
Comments

Advertisement

Table of Contents
loading

Table of Contents