IBM N6000 Series Installation And Setup Instructions page 8

Filer
Hide thumbs Also See for N6000 Series:
Table of Contents

Advertisement

Note: Four Small Form Factor Pluggable (SFP) modules per node will either be in the accessory box or
will be installed in the fiber ports of the storage system.
1. Verify that the shipping packages include the following items.
N6040 (2858-A10) / N6060 (2858-A12) / N6070 (2858-A11)
1 single-controller N6040/N6060/N6070
1 console adapter, RJ-45 to DB-9
1 cable management tray
1 serial null modem cable
1 electrostatic discharge (ESD) wrist strap
2 power cords
1 IBM rail kit
1 publications CD
1 or more envelopes with the software End User License Agreement (EULA) and license keys
N6040 (2858-A20) / N6060 (2858-A22) / N6070 (2858-A21)
1 dual-controller N6040/N6060/N6070
2 console adapters, RJ-45 to DB-9
2 cable management trays
2 serial null modem cables
1 ESD wrist strap
2 power cords
1 IBM rail kit
1 publications CD
1 or more envelopes with the software EULA and license keys
2. Remove the foam hardware protectors and the plastic surrounding the system.
32-55 kg (70.5-121.2 lbs)
3. Remove the storage system using the integrated handles attached to the sides of the storage system.
Place the storage system on a table.
2
CAUTION:
The weight of this part or unit is between 46 and 55 kg (102 and 121 lb). It takes three
persons to safely lift this part or unit. (C010)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents