GUTMANN APILAR 9400EM Installation Instructions Manual page 21

Hide thumbs Also See for APILAR 9400EM:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 12
Ceiling mounting
7. Hold the mounting frame to the ceiling along the holes and screw in the fixing
screws.
8. Lift the APILAR with the mounting lift at a small distance below the ceiling and
connect it to the power cable and the terminals. Roll up the cable.
9. Lift it up to the ceiling and slide it into the holding slots " Y ".
10. Screw in the locking screws.
11. Connect the power supply to the mains. Carry out a function test according to the
operating instructions.
12. Cleaning.
EN
21

Advertisement

Table of Contents
loading

Table of Contents