GUTMANN APILAR 9400EM Installation Instructions Manual page 20

Hide thumbs Also See for APILAR 9400EM:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 12
EN
Assembly preparation
General:
Before the cooker hood leaves our factory, it undergoes a detailed functional test.
The APILAR ceiling cooker hood is delivered completely installed. For ceiling installati-
on, the instructions on the following pages must be observed.
1. Carefully remove the cooker hood with 2 persons from the packaging with your fin-
gers in the supply air slot and place it on the assembly lift using a base. Loosen 2
locking screws and pull out the mounting plate.
2. Then prepare the mounting location on the ceiling. To achieve optimum extraction
capacity, the hood must be positioned centrally above the hob. Mark the centre of
the hood on the ceiling using a plumb line.
3. Mounting hole - Transfer the dimensions of the mounting frame to the ceiling - Note
the 15mm offset ( dimension drawing ) .
4. Determine position for wireing or terminal box. Should be installed in the area of the
large opening of the mounting frame.
5. Drill six 8 x >60 mm holes in the ceiling according to the dimensioned drawing and
insert dowels suitable for the masonry. ( for this concrete drill 8mm )
6. Make the electrical connection.
20
ASSEMBLY INSTRUCTION
centered on " V " - marking

Advertisement

Table of Contents
loading

Table of Contents