6
Commissioning
6.1
Commissioning the product
 Verify that the modules are properly connected.
 Verify that the product is properly mounted to the DIN rail.
 Apply mains voltage.
- The green LEDs for operation of the base module and the product light.
6.2
Wired system: Function test room controller
 Verify that the room temperature is between +15 °C and +25 °C.
1. Verify that the room controller to be tested is connected to the correct control cir-
cuit.
2. Set the room controller to be tested to +30 °C.
- The yellow LED lights up at the controller module to which the room temperature
controller is connected.
3. Repeat this procedure for all other room controllers.
6.3
Wireless system
less controller module
6.3.1
Preparation
 Verify that the single room temperature controller is in operation and that the
cover of the product has been removed.
 Verify that the room controllers have been exposed to sunlight for at least one
day or that they have a battery.
 Verify that the room controllers are close to the product.
 Verify that the rear side of each of the room controllers are numbered consec-
utively and marked with the place of use. This helps to avoid subsequent con-
fusion.
 Verify that a paper clip bent open and a ballpoint pen are available.
(1)
The wireless system is only available in certain sales areas.
Commissioning
(1)
: Connecting the room controller to the wire-
RoCon UFH
EN
37