Download Print this page

Unpacking Instructions - ABI Attachments Force Z-23 Product Instruction Sheet

Rear rake attachment
Hide thumbs Also See for Force Z-23:

Advertisement

Unpacking Instructions:

Tools Needed:
Safety Glasses
Gloves
Tin Shears
(2) 15/16" wrenches
(1) 1-1/16" wrench
1. Cut metal straps (Use caustion when cutting
metal straps that they do not spring toward you
and cause injury)
2. Cut Zip-Tie from "T" Bar
3. Remove plastic wrap from frame
Remove steel straps, zip-ties, and plastic wrap.
Unit Setup and Adjustments:
Scarifier Pitch Adjustment
The Top Link will be shipped with the threads fully engaged
within the main body of the Top Link and 1 end not bolted
to the frame (for shipping purposes). Rotate Axle Frame
Assembly so that Tongue and Gage Wheels (Tire) are facing
forward and attach end of Top Link to frame using (2) 15/16"
wrenches (See Figure 1). Remove from Skid.
Figure 1:
Rotate each end of the Top Link until about 1" of thread is
showing on each end. This will get you close to the normal
working position (pitch) of the Scarifiers. You can fine tune
the pitch as desired.
Once the pitch is set, tighten the nut (1-1/16" to keep the
threaded ends from moving during operation.
(See Figure 2)
Figure 2: Scarifier Pitch
2
Attach Top Link to frame using
(2) 5/16" wrenches
Add Spacer to each side of link
Hole for optional Hitch Pin
storage location when not
attached to the Z-23 Force
Tighten Nut using 1-1/16"
wrench once desired pitch is set
For initial setup, adjust the
Top Link threads to about 1" of
thread showing on both ends

Advertisement

loading