Initial Operation; Version With One Sewage Pump - deconta C 130 L Instruction Manual

Water treatment boiler system
Table of Contents

Advertisement

Instruction manual
Water treatment boiler system C 130 L

6 Initial operation

Before the initial operation of the waste water pump or after a long period of stagnation,
check that the shaft rotates freely when turned by hand. To check this put a screwdriver
in the notch of the shaft end on the fan side and move the shaft. The strong initial
rotational resistance of the new pumps will come loose after running.
Safety instructions:
During works on the device always disconnect the plug!
Operate the device only with mains which are secured with fault current protection
switch!
Never operate the device without water! In case of frost risk, empty the device by
opening the stopcock!
Check outlet temperature before every shower!
CAUTION! Danger of scalding

6.1 Version with one sewage pump

Sewage OUT
Sewage IN
Shower water
Water inlet
page 7

Advertisement

Table of Contents
loading

Table of Contents