Before the initial operation of the waste water pump or after a long period of stagnation,
check that the shaft rotates freely when turned by hand. To this put a screwdriver in the
notch of the shaft end on the fan side and move the shaft. The strong initial rotational
resistance of the new pumps will come loose after running.
Sewage OUT
Unplug
 Establish hose connections:
o Connection „Water inlet" with pipeline network
o Connection „Warm water shower water" with shower top
o Connection „Sewage IN" with shower tray
o Connection „Sewage OUT" with sewage system
 Fill waste water pump with water
 Connect to power
 Set Temperature selector at the bottom of tank to level 3 (heating phase begins,
duration approx. 80 minutes to heat water up to 80°C)
 Due to safety reasons, water escapes during heating. Put container under
overflow.
 the unit is now ready-to-operate