Qlima SC42 Series Installation Manual page 84

Hide thumbs Also See for SC42 Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 68
6.
Now remove the cover on the bottom valve using a 19 mm open-ended spanner. Open the valve by
turning it counter-clockwise as far as it will go using a 5 mm Allen key. The valve is now open. If the
valve is not opened fully, the system may malfunction and suffer damage. Screw the cover back on
to the bottom valve and tighten it well to ensure that it is properly sealed.
Important! The conical ring on the valve has an important sealing function together with the sealing seat in
the caps. Ensure that you do not damage the cone and that you keep the cap free of dirt and dust.
7.
After completing steps 1- 6, check that all the connections are sealed correctly using leak detection
spray or soap suds. If any bubbles form, the system has a leak and the screw connectors must be
retightened using an open- ended spanner.
8.
Start the equipment so that the operating pressures build up inside it. Check all the connectors again
for signs of leaks
a) during cooling mode
b) in heating mode.
If any bubbles form, the system has a leak and the screw connectors must be retightened using an open-
ended spanner.
4
84
84

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents